Hongasandra metro station

Coordinates: 12°54′06″N 77°37′55″E / 12.90165°N 77.63208°E / 12.90165; 77.63208
From Wikipedia, the free encyclopedia

Hongasandra
Namma Metro station
Final stages of this metro station as of April 2024
General information
Other namesGarvebhavi Palya
LocationHongasandra, Bengaluru, Karnataka 560068
Coordinates12°54′06″N 77°37′55″E / 12.90165°N 77.63208°E / 12.90165; 77.63208
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectITD - ITD Cementation India JV
Other information
StatusAwaiting trainsets and ready for operations
Station code(TBC)
History
OpeningAugust 2025; 2 months' time (August 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Bommanahalli Yellow Line
(Operational around August 2025)
Kudlu Gate
towards Bommasandra
Location
Map

Hongasandra (also known as Garvebhavi Palya) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

As per latest reports, the Yellow Line is slated to be operational around August 2025 [1][2][3][4][5] instead of May 2025[6][7][8] which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.

History

[edit]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Hongasandra metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[9] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

[edit]

Station Layout (TBC)

Hongasandra track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Kudlu Gate
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Bommanahalli
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

[edit]

See also

[edit]

References

[edit]
  1. ^ "Namma Metro Yellow Line Updates, Metro Delay Bengaluru: Yellow Line Launch Pushed to July-End Amid Snags | Bengaluru Metro News". Deccan Herald. Retrieved 27 May 2025.
  2. ^ "Bengaluru's Yellow Line Metro faces further delay, unlikely to open before July-end: Report". Hindustan Times. 27 May 2025. Retrieved 27 May 2025. {{cite web}}: |first= missing |last= (help)
  3. ^ "Bengaluru Namma Metro Update: Yellow Line Operations To Start In June | Check Status, Key Stations". English Jagran. 6 April 2025. Retrieved 6 April 2025.
  4. ^ "Bengaluru Metro Yellow Line: Operations To Start By June? Check Current Status & Key Stations". Times Now. 5 April 2025. Retrieved 6 April 2025.
  5. ^ Parangi, Shankrappa (6 April 2025). "Namma Metro Yellow line: ಏಪ್ರಿಲ್ ಅಂತ್ಯಕ್ಕೆ 3ನೇ ರೈಲು, ಹಳದಿ ಮಾರ್ಗ ಕಾರ್ಯಾಚರಣೆ ಅಪ್ಡೇಟ್". kannada.oneindia.com (in Kannada). Retrieved 6 April 2025.
  6. ^ "Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By..." Times Now. 11 March 2025. Retrieved 12 March 2025.
  7. ^ "Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025". English Jagran. 10 March 2025. Retrieved 12 March 2025.
  8. ^ "Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway". Deccan Herald. Retrieved 7 January 2025.
  9. ^ "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Hosa Rd - HSR Layout". The Metro Rail Guy. 25 April 2017. Retrieved 24 October 2024.
[edit]