Jump to content

Alandur metro station

Coordinates: 13°00′15″N 80°12′05″E / 13.004202°N 80.201471°E / 13.004202; 80.201471
From Wikipedia, the free encyclopedia


Arignar Anna Alandur Metro Station
Logo of Chennai Metro Chennai Metro station
A train arriving at the station
General information
LocationAlandur, Chennai - 600016, Tamil Nadu,
 India
Coordinates13°00′15″N 80°12′05″E / 13.004202°N 80.201471°E / 13.004202; 80.201471
Owned byChennai Metro Rail Limited
Operated byChennai Metro Rail Limited
Line(s)Blue Line Green Line Red Line  Inter Corridor Line 
PlatformsSide platform
Platform-1Chennai International Airport (to be extended to Kilambakkam in the future)
Platform-2Wimco Nagar Depot
Platform-3St. Thomas Mount
Platform-4M.G.R Chennai Central
Platform-5Sholinganallur
Platform-6
Madhavaram Milk Colony
Avadi (proposed branch line to construct in future)
Tracks4
Construction
Structure typeElevated, Double track
Platform levels2
Other information
Station codeSAL
Websitehttp://chennaimetrorail.org
History
Opened29 June 2015; 9 years ago (2015-06-29) (Green Line)
21 September 2016; 8 years ago (2016-09-21) (Blue Line)
Passengers
10000/day (2018)[1]
Services
Preceding station Logo of Chennai Metro Chennai Metro Following station
Guindy Blue Line Nanganallur Road
Blue Line
(Future Service)
Nanganallur Road
towards Kilambakkam
Ekkattuthangal Green Line St. Thomas Mount
Terminus
Butt Road Red Line St. Thomas Mount
Location
Map

Arignar Anna Alandur Metro, commonly known as the Alandur Metro, is an elevated metro station that is part of the Blue Line and the Green Line of the Chennai Metro, and serves as an interchange station between the two lines. The station is one of the two metro stations where the two lines intersect, the other being the Chennai Central metro station. It is the city's first multi-level railway station.[2] It is the only station where passengers from the two corridors can swap the direction of travel.[3] On 31 July 2020, It has been named by Government of Tamil Nadu as Arignar Anna Alandur Metro to honor the DMK founder and the former Chief Minister of Tamil Nadu C. N. Annadurai.[4]

The station

[edit]
Alandur metro station concourse
Outer view of the Alandur Metro Station

As the station acts as a transit point for two different corridors of the Chennai Metro, the two lines are constructed at two different levels at the station—the first one serving the line from Guindy towards Officers Training Academy (OTA) and Chennai International Airport and the second one for the line from St. Thomas Mount towards Chennai Mofussil Bus Terminus.[5] The two levels are being built at 26.55 m and 35.41 m within the station, connected by means of escalators.[2] Each levels will have two access points for entry and exit.[5] A mezzanine floor—an intermediate level between ground floor and level I—is being built to be utilised for maintenance purpose.[2]

A total of eight elevators will function at the station—four connecting the ground floor with level I and another four, along with four escalators, connecting level I with level II. The station will have 10 ticket counters apart from 18 automatic ticket-vending machines (ATVMs).[2]

The station will have four access points on the ground floor—two for entry/exit from the front and two more on the rear. Ticket counters, one at either side of the lobby, are located past the access points. Crossing the lobby, passengers can move on to level I using any of the eight escalators and four lifts.[3]

Level I is the alighting point for those travelling on the Guindy–OTA–Airport route. From this level, there are four escalators and lifts leading to level II, from where passengers bound for the Koyambedu–SIDCO–St. Thomas Mount route can embark.[3]

The station will also have disabled-friendly facilities, including separate escalators and entry ramps.[2]

The station is one of the few in the corridor that will have parking facilities.[6]

Station layout

[edit]
Arignar Anna Alandur track layout
P2
P1
Station with two tracks and two side platforms
Arignar Anna Alandur track layout
P3
P4
Station with two tracks and two side platforms
Arignar Anna Alandur track layout
P#
P#
Station with two tracks and two side platforms
G Street level & Concourse Exit/Entrance, Fare control, station agent, Metro Card vending machines, crossover
L1 Side platform | Doors will open on the left Disabled access
Platform 1
Southbound
Towards → Chennai International Airport
Next Station: Nanganallur Road
(to be further extended to Kilambakkam under Blue Line in the future)
Platform 2
Northbound
Towards ← Wimco Nagar Depot
Next Station: Guindy
Side platform | Doors will open on the left Disabled access
L2 Side platform | Doors will open on the left Disabled access
Platform 4
Northbound
Towards → Chennai Central
Next Station: Ekkattuthangal
Platform 3
Southbound
Towards ← St. Thomas Mount & Chennai International Airport
Side platform | Doors will open on the left Disabled access
L3 Side platform | Doors will open on the left Disabled access
Platform 5
Southbound
Towards → Sholinganallur
Next Station: St. Thomas Mount
Platform 6
Northbound
Towards ← Madhavaram Milk Colony
Next Station: Butt Road
Side platform | Doors will open on the left Disabled access

Receiving sub-station

[edit]

A 230-kV receiving substation (RSS) is being built by the Tamil Nadu Electricity Board near the station for CMRL project. TNEB would supply 110 kV power from nearby TNEB substation (being built by TNEB) to the RSS, which will be stepped down to 33 kV and 25 kv by two transformers. The station is one of the three stations in the Chennai Metro Rail network to have a 230-kV receiving sub-station for power supply from the state's electricity grid, the other two being Koyambedu and Chennai Central metro.[7]

Supporting facilities

[edit]

The Cantonment Board has decided to set up three AC bus shelters at Asar Ghana junction near the metro station, which would become an intermodal transport hub. Each shelter will be spread over 370 sq ft with a seating capacity of 32 passengers and standing capacity of 45. Other facilities at the shelters would include ATM, CCTV, security guards, public urinals, drinking water, coffee vending machines and announcements about bus arrivals. Commuters will be able to see a bus coming from 500 metres on an LCD screen in the shelter. This would be the first of AC bus shelters in Chennai. The shelters would come up under a PPP model at an estimated cost of 12.5 million, which would be constructed and maintained for five years by a private firm, after which it will hand over the shelters to the board. The firm's revenue generation would be through advertisements in the shelter.[8]

In May 2018, CMRL began construction of foot overbridge at the station at a cost of 90 million and is expected to be completed in eight months.[1]

Commercial hub

[edit]

Arignar Anna Alandur metro station is one of the five stations in the first phase of the Chennai Metro project identified to be converted into commercial hubs, the others being Puratchi Thalaivi Dr. J. Jayalalithaa CMBT Metro, Arumbakkam, Ekkattuthangal, and Ashok Nagar. A 118,000 sq ft building with a basement and stilt floor for car park is planned behind the station.[9]

See also

[edit]

References

[edit]
  1. ^ a b Sekar, Sunitha (23 May 2018). "Construction of foot overbridge begins at Alandur Metro station". The Hindu. Chennai: Kasturi & Sons. Retrieved 5 August 2018.
  2. ^ a b c d e Karthikeyan, K. (14 April 2012). "Designed for excellence: Alandur to become prime metro station". The Deccan Chronicle. Chennai: Deccan Chronicle. Archived from the original on 14 April 2012. Retrieved 13 November 2012.
  3. ^ a b c Raja Simhan, T. E. (4 May 2012). "Multi-level Metro rail corridor structure coming up at Alandur". Business Line. Chennai: The Hindu. Retrieved 4 February 2015.
  4. ^ "Tamil Nadu government to rename three metro rail stations in Chennai after late Chief Ministers". The New Indian Express. 31 July 2020. Retrieved 31 July 2020.
  5. ^ a b "ஆலந்தூரில் பிரமாண்ட மெட்ரோ ரயில் நிலையம்". Chennai Online (in Tamil). Chennai. 14 April 2012. Archived from the original on 4 March 2016. Retrieved 16 November 2012.
  6. ^ "Single train trip to equal 16 buses, 300 cars and 600 bikes". The Hindu. Chennai. 29 August 2012. Retrieved 25 November 2012.
  7. ^ "Metro rail sets up units to power trains, stations to meet year-end deadline to start services". The Times of India. Chennai. 15 April 2014. Retrieved 18 April 2014.
  8. ^ Mathew Philip, Christin (17 September 2014). "3 AC bus shelters planned near Alandur metro station". The Times of India. Chennai: The Times Group. Retrieved 2 October 2014.
  9. ^ TNN (23 September 2014). "In less than a year, you can park, shop and ride at metro rail stations". The Times of India. Chennai: The Times Group. Retrieved 3 February 2015.
[edit]