Line 5 (Hangzhou Metro)
Line 5 of the Hangzhou Metro (simplified Chinese: 杭州地铁五号线; traditional Chinese: 杭州地鐵五號線; pinyin: Hángzhōu Dìtiě Wǔhào Xiàn) is a subway line in Hangzhou. The line is colored cyan on system maps.
Opening timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Liangmu Road — Shanxian | 24 June 2019 | 17.76 kilometres (11.04 mi) | 12 | Phase 1 (initial section) |
Shanxian — Guniangqiao | 23 April 2020 | 36.16 kilometres (22.47 mi) | 21 | Phase 1 (final section) |
Jinxing — Liangmu Road | 23 April 2020 | 4 | Phase 2 | |
South Railway Station[6] | 30 June 2020 | Infill station | 1 | |
Baoshan Bridge | 1 April 2022[7] | 1 |
Stations
[edit]Line 5 runs from Jinxing and Guniangqiao. The western terminus, Guniangqiao, is an interchange with Shaoxing Metro Line 1. In the future, there will be an expansion to Yuxiong Academy School and Fangquan, changing Shaoxing Metro Line 1 stations in the main line to Line 5.
- Legend
- Operational
- Under construction
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
East Nanhu[1] | 南湖东 | 0.42 | Yuhang | |||
Jinxing | 金星 | 2.03 | 2.45 | |||
Lvting Road | 绿汀路 | 3 16 | 2.59 | 5.04 | ||
Gexiang | 葛巷 | 1.75 | 6.79 | |||
Chuangjing Road | 创景路 | 19 | 0.87 | 7.66 | ||
Liangmu Road | 良睦路 | 1.31 | 8.97 | |||
Cangqian Campus Hangzhou Normal University | 杭师大仓前 | 1.01 | 9.98 | |||
Yongfu | 永福 | 0.93 | 10.91 | |||
Wuchang | 五常 | 1.91 | 12.82 | |||
Jiangcun | 蒋村 | 2.27 | 15.09 | Xihu | ||
Zijingang Campus Zhejiang University | 浙大紫金港 | 0.79 | 15.88 | |||
Sanba | 三坝 | 2 | 2.28 | 18.16 | ||
Pingshui Street | 萍水街 | 1.47 | 19.63 | Gongshu | ||
Hemu | 和睦 | 10 | 1.08 | 20.71 | ||
The Grand Canal | 大运河 | 1.68 | 22.39 | |||
East Gongchen Bridge | 拱宸桥东 | 1.62 | 24.01 | |||
Shanxian | 善贤 | 3 | 1.16 | 25.17 | ||
Xiwen Street | 西文街 | 1.01 | 26.18 | |||
Dongxinyuan | 东新园 | 1.15 | 27.33 | |||
Hangyang | 杭氧 | 1.63 | 28.96 | |||
Datieguan | 打铁关 | 1 | 1.00 | 29.86 | ||
Baoshan Bridge | 宝善桥 | 1.63 | 31.49 | |||
North Jianguo Road | 建国北路 | 2 | 0.81 | 32.30 | ||
Wan'an Bridge | 万安桥 | 1.13 | 33.43 | Shangcheng | ||
Chengzhan | 城站 | 1 HZH |
1.08 | 34.51 | ||
Jiangcheng Road | 江城路 | 7 | 0.75 | 35.26 | ||
Houchaomen | 候潮门 | 1.43 | 36.69 | |||
Nanxingqiao | 南星桥 | 4 | 1.23 | 37.92 | ||
Changhe | 长河 | 6 | 2.72 | 40.64 | Binjiang | |
Jucai Road | 聚才路 | 1.74 | 42.38 | |||
Jianghui Road | 江晖路 | 1.23 | 43.61 | |||
Binkang Road | 滨康路 | 1 | 1.93 | 45.54 | ||
Bo'ao Road | 博奥路 | 1.26 | 46.80 | Xiaoshan | ||
Jinji Road | 金鸡路 | 0.92 | 47.72 | |||
People's Square | 人民广场 | 2 | 1.23 | 48.95 | ||
North Yucai Road | 育才北路 | 1.10 | 50.05 | |||
Middle Tonghui Road | 通惠中路 | 0.72 | 50.77 | |||
South Railway Station | 火车南站 | HZN Shaoxing TNT |
1.86 | 52.63 | ||
Shuangqiao | 双桥 | 1.14 | 53.77 | |||
Guniangqiao | 姑娘桥 | 1 (Shaoxing Metro) | 2.26 | 56.03 | ||
Description
[edit]Phase 1 of the line is 48.6 km (30.2 mi) long with 36 stations and runs between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line (now Keqiao section of Line 1 of the neighboring Shaoxing Metro).[8] Phase 2 of the line further extends 3.2 km and two stations east to Lvting Road.[9] A 5 km (3.1 mi), two station extension west to Laoyuhang station in Yuhang District started construction in 2018.[10]
Rolling stock
[edit]The Line 5 uses higher capacity six car Class AH trains which are 20 cm wider than the Class B trains used in other Hangzhou Metro lines, increasing capacity by about 10%.[11]
Stock | Class | Year built | Builder | Number built | Numbers | Formation | Depots | Line assigned | Notes |
---|---|---|---|---|---|---|---|---|---|
PM126 | AH | 2018-2020 | CRRC Nanjing Puzhen | 366 (61 sets) | 05 001 - 05 061 (050011-050616) | Tc+Mp+M+M+Mp+Tc | Wuchang Depot Guniangqiao Yard |
5 | |
PMAAD | 2024-2025 | 54 (9 sets) | 05 062 - 05 070 (050621-050706) | Awaiting delivery. |
See also
[edit]References
[edit]- ^ a b "杭州市人民政府关于杭州机场轨道快线工程、地铁3号线一期工程及5号线二期工程车站站名的批复". 16 June 2022. Archived from the original on 16 June 2022.
- ^ "MTR : Concession Agreement for Hangzhou Metro Line 5 Signed". marketscreener.com. Retrieved 27 February 2019.
- ^ "Announcement of unaudited results for the six months ended 30 June 2021" (PDF). MTR Corporation. 12 August 2021. p. 36. Archived (PDF) from the original on 13 August 2021. Retrieved 14 August 2021.
Total patronage of HZL5 was 87 million in the first half of 2021 with an average weekday patronage of 535,000.
- ^ "快不快好不好?杭州地铁5号线首通段初体验-浙江在线杭州在线网站".
- ^ "杭州地铁5号线后通段、16号线计划4月底通车". 27 March 2020. Retrieved 19 April 2020.
- ^ "明天上午10点,下宁桥站、火车南站站同步开通!". 29 June 2020.
- ^ "杭州地铁7号线江北段、9号线一期南段、5号线宝善桥站,今天全部开通了". Hangzhou.com.cn. 1 April 2022. Retrieved 1 April 2022.
- ^ "杭州地铁5号线开工 余杭未来科技城3个车站率先建 - 杭网原创 - 杭州网". ori.hangzhou.com.cn. Archived from the original on 20 December 2014. Retrieved 6 February 2019.
- ^ "运营中的杭州地铁1号线底下 5号线悄悄穿过 - 杭州网 - 杭州新闻中心". hznews.hangzhou.com.cn. Retrieved 6 February 2019.
- ^ "地铁5号线确定向西延伸 期待明年完工". zj.zjol.com.cn. Retrieved 6 February 2019.
- ^ "杭州地铁5号线"小青"已抵达杭州 预计今年年底开通 - 杭网原创 - 杭州网". ori.hangzhou.com.cn. Retrieved 6 February 2019.