Jump to content

Lak Si station

Coordinates: 13°53′04″N 100°34′51″E / 13.884348°N 100.580793°E / 13.884348; 100.580793
From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Monkbot (talk | contribs) at 11:32, 24 October 2024 (Task 20: replace {lang-??} templates with {langx|??} ‹See Tfd› (Replaced 1);). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Lak Si

หลักสี่
Dark Red Line platforms
General information
LocationKamphaeng Phet 6 Rd, Talat Bang Khen Subdistrict, Lak Si
Bangkok
Thailand
Coordinates13°53′04″N 100°34′51″E / 13.884348°N 100.580793°E / 13.884348; 100.580793
Operated byState Railway of Thailand (SRT)
Northern Bangkok Monorail Company Limited (MRT)
Managed byMinistry of Transport (SRT)
Mass Rapid Transit Authority of Thailand (MRT)
Platforms2 (SRT)
2 (MRT)
Tracks4 (SRT)
2 (MRT)
Construction
Structure typeElevated
ParkingYes
Bicycle facilitiesYes
Other information
Station codeRN06 (SRT)
PK14 (MRT)
History
Opened1898; 126 years ago (1898) (original)
2 August 2021; 3 years ago (2021-08-02) (Dark Red Line)
21 November 2023; 12 months ago (2023-11-21) (Pink Line)
Closed19 January 2023; 22 months ago (2023-01-19) (original)
Electrified25 kV 50 Hz AC overhead catenary
Services
Preceding station SRT Red Lines Following station
Thung Song Hong Dark Red Line Kan Kheha
towards Rangsit
Preceding station Metropolitan Rapid Transit Following station
National Telecom Pink Line Rajabhat Phranakhon
towards Min Buri
Location
Map

Lak Si Station (Thai: สถานีหลักสี่) is a railway station in the area of Bangkok's Lak Si district. It serves the SRT Dark Red Line and MRT Pink Line.

History

[edit]

Lak Si station opened in 1898 as part of Thailand's first railway between Bangkok and Ayutthaya.[1] The original station structure was demolished in 1990 during the construction of the failed Hopewell BERTS project.

The new elevated station opened on 2 August 2021.[2][3] The ground-level station closed on 19 January 2023 and long-distance trains on the Northern and Northeastern lines stopped operating from the ground-level station entirely.[4]

On 21 November 2023 it became an interchange station to the Pink Line monorail.[5][6]

[edit]

References

[edit]
  1. ^ "State Railway of Thailand (SRT) - History". Ministry of Transport.
  2. ^ "คู่มือเดินทางด้วยรถไฟชานเมืองสายสีแดง-บอกสถานที่ใกล้สถานีตลอดเส้นทาง". Archived from the original on 2021-08-24.
  3. ^ "คู่มือรถไฟฟ้าสายสีแดง แบบละเอียดยิบ รู้ไว้ใช้บริการไม่มีหลง". Archived from the original on 2021-09-19.
  4. ^ "การรถไฟฯ กำหนดให้วันที่ 19 มกราคม 2566 ปรับเปลี่ยนขบวนรถไฟทางไกล เหนือ ใต้ อีสาน ของขบวนรถด่วนพิเศษ รถด่วน รถเร็ว จำนวน 52 ขบวน".
  5. ^ "เช็ก 30 สถานีรถไฟฟ้าสายสีชมพู ก่อนเปิดทดลองนั่งฟรี 21 พ.ย.นี้".
  6. ^ "'รถไฟฟ้าสายสีชมพู' ทดลองใช้ฟรีมาแล้ว บอกหมดเป็นไงบ้าง" (in Thai).