On 14 June 2017, a high-rise fire broke out in the 24-storey Grenfell Tower block of flats in North Kensington, West London, England, at 00:54 BST and burned for 60 hours. Seventy people died at the scene and two people died later in hospital, with more than 70 injured and 223 escaping. It was the deadliest structural fire in the United Kingdom since the 1988 Piper Alpha oil-platform disaster and the worst UK residential fire since the Blitz of World War II.

Grenfell Tower fire
A tower block (Grenfell Tower) burning on nearly all floors with large amounts of smoke rising, and water being sprayed at the building from firefighters.
The fire during the early morning hours of 14 June 2017
Grenfell Tower is located in Royal Borough of Kensington and Chelsea
Grenfell Tower
Grenfell Tower
Grenfell Tower is located in Greater London
Grenfell Tower
Grenfell Tower
Grenfell Tower is located in the United Kingdom
Grenfell Tower
Grenfell Tower
Date14 June 2017; 7 years ago (2017-06-14)
Time00:54 BST (first emergency call)
Duration24 hours (under control)
Over 60 hours (fully extinguished)
LocationGrenfell Tower, North Kensington, London, United Kingdom
Coordinates
TypeStructure fire
CauseElectrical fault in a refrigerator; spread of fire largely exacerbated by flammable exterior cladding on the building[1]
Outcome
  • Government taskforce taking over parts of the RBKC council function
  • Urgent fire safety tests on cladding from similar towers
  • Independent review of building regulations and fire safety commissioned
  • £200 million pledged from Government to replace similar cladding in other residential towers in England
  • UK cladding crisis - over £5 billion pledged by government since 2017. Approximate estimates vary from £15 billion to £50 billion[2]
Deaths72
Non-fatal injuries74 (20 serious)
Property damage£200 million – £1 billion (estimated)[3]
InquiriesPublic inquiry hearings opened 14 September 2017. Final report published 4 September 2024.
InquestOpen for all 72 victims; pending police investigation.
Websitewww.grenfelltowerinquiry.org.uk Edit this at Wikidata

The fire was started by an electrical fault in a refrigerator on the fourth floor.[note 1] As Grenfell was an existing building originally built in concrete to varying tolerances, gaps around window openings following window installation were irregular and these were filled with combustible foam insulation to maintain air-tightness by contractors.[4] This foam insulation around window jambs acted as a conduit into the rainscreen cavity, which was faced with 150 mm-thick (5.9-inch) combustible polyisocyanurate rigid board insulation and clad in aluminium composite cladding panels, which included a 2 mm (0.079-inch) highly combustible polyethylene filler to bond each panel face together. As is typical in rainscreen cladding systems, a ventilated cavity between the insulation board and rear of the cladding panel existed; however, cavity barriers to the line of each flat were found to be inadequately installed, or not suitable for the intended configuration, and this exacerbated the rapid and uncontrolled spread of fire, both vertically and horizontally, to the tower.[5]

The fire was declared a major incident, with more than 250 London Fire Brigade firefighters and 70 fire engines from stations across Greater London involved in efforts to control it and rescue residents. More than 100 London Ambulance Service crews on at least 20 ambulances attended, joined by specialist paramedics from the Ambulance Service's Hazardous Area Response Team. The Metropolitan Police and London's Air Ambulance also assisted the rescue effort.

The fire is the subject of multiple complex investigations by the police, a public inquiry, and coroner's inquests. Among the many issues investigated are the management of the building by the Kensington and Chelsea London Borough Council and Kensington and Chelsea TMO (which was responsible for the borough's council housing), the responses of the Fire Brigade, other government agencies, deregulation policy, building inspections, adequate budgeting, fire safety systems, the materials used, companies installing, selling and manufacturing the cladding, and failures in communications, advice given or decisions made by office holders. In the aftermath of the fire, the council's leader, deputy leader and chief executive resigned, and the council took direct control of council housing from the KCTMO.

Parliament commissioned an independent review of building regulations and fire safety, which published a report in May 2018. In the UK and internationally, governments have investigated tower blocks with similar cladding. Efforts to replace the cladding on these buildings are ongoing. A side effect of this has been hardship caused by the United Kingdom cladding crisis.

The Grenfell Tower Inquiry began on 14 September 2017 to investigate the causes of the fire and other related issues. Findings from the first report of the inquiry were released in October 2019 and addressed the events of the night. It affirmed that the building's exterior did not comply with regulations and was the central reason why the fire spread, and that the fire service were too late in advising residents to evacuate.

A second phase to investigate the broader causes began on 27 January 2020. Extensive hearings were conducted, and the Inquiry Panel published their final report on 4 September 2024. Following publication, police investigations will identify possible cases and the Crown Prosecution Service will decide if criminal charges are to be brought. Due to the complexity and volume of material, cases are not expected to be presented before the end of 2026, with any trials from 2027. In April 2023, a group of 22 organisations, including cladding company Arconic, Whirlpool and several government bodies, reached a civil settlement with 900 people affected by the fire.

Background

edit
 
Map of the western side of the Lancaster West Estate. The fire also severely affected three low-rise "finger blocks" adjoining Grenfell Tower.

Building and construction

edit

Grenfell Tower was part of the Lancaster West Estate, a council housing complex in North Kensington. The 24-storey tower block was designed in 1967 in the Brutalist style of the era by Clifford Wearden and Associates, and the Kensington and Chelsea London Borough Council approved its construction in 1970.[6][7][8][9] The building was constructed by contractors A E Symes of Leyton from 1972 to 1974.[10]

The 220-foot-10-inch (67.30 m) tall building contained 120 one-bedroom and two-bedroom flats.[11] The upper 20 (of 24) storeys were residential floors, with each having a communal lobby and six dwellings, with ten bedrooms among them.[11] The lower four storeys were originally used for non-residential purposes.[note 2] Later, two lower floors were converted to residential use, bringing the total to 129 apartments, housing up to 600 people.[12] The original lead architect for the building, Nigel Whitbread, said in 2016 that the tower had been designed with attention to strength following the 1968 Ronan Point disaster and "from what I can see could last another hundred years".[14]

Like many other tower blocks in the UK, Grenfell Tower was designed to be operated under a "stay put policy" in the event of fire. The idea was that if a fire broke out in one flat, thick walls and fire doors would contain the fire long enough for the fire service to bring it under control (compartmentation).[15] Only those in the affected dwelling would be expected to evacuate.[16] The building was designed under the assumption that a full evacuation would never be necessary. There was no centrally activated fire alarm and only a single central staircase.[17][18] Unlike those in many other countries, UK regulations do not require a second.[18] In 2010, a fire broke out in a lobby and was quickly extinguished.[19]

Management

edit

Until 1996, Kensington and Chelsea London Borough Council managed its council housing directly. In 1996, the council created Kensington and Chelsea TMO (KCTMO), a tenant management organisation which would manage its council housing stock.[20] KCTMO had a board comprising eight residents (tenants or leaseholders), four council-appointed members and three independent members.[21] The tower was built as council housing, but fourteen of the flats had been bought under the Right to Buy policy. These were occupied by leaseholders, or were privately rented out by them on the open market.[22]

Renovation

edit
 
Grenfell Tower in 2012 before the renovation

Grenfell Tower underwent a major renovation, announced in 2012 and conducted over 2015–2016.[12][23] The tower received new windows, a water-based heating system for individual flats and new aluminium composite rain screen cladding.[24][25][26] According to the application, the purpose of the cladding was to improve heating and energy efficiency, and external appearance. Mark Harris, of Harley Facades, said, "from a selfish point of view", his company's preference was to use cheaper aluminium composite material.[27][23]

Two types of cladding were used: Arconic's Reynobond PE, which consists of two coil-coated aluminium sheets that are fusion bonded to both sides of a polyethylene core; and Reynolux aluminium sheets. Beneath these, and fixed to the outside of the walls of the flats, was Celotex RS5000 PIR thermal insulation.[28][29][30] An alternative cladding with better fire resistance was refused due to cost.[31]

The original contractor, Leadbitter, had been dropped by KCTMO because their price of £11.278 million was £1.6 million higher than the proposed budget. The contract was put out to competitive tender and won by Rydon, whose bid was £2.5 million less than Leadbitter's.[32] Rydon carried out the refurbishment for £8.7 million, with Artelia on contract administration and Max Fordham as specialist mechanical and electrical consultants.[32][33][34][35][36] The cladding was fitted by Harley Facades of Crowborough, East Sussex, at a cost of £2.6 million.[37]

Safety concerns

edit

Residents had expressed significant safety concerns before the fire.[38] Twelve years earlier, a report had criticised the tower's emergency lighting.[39] The Grenfell Action Group (GAG) ran a blog in which it highlighted major safety problems, criticising the council and KCTMO for neglecting fire safety and building maintenance.

In 2013, the group published a 2012 fire risk assessment by a KCTMO Health and Safety Officer which recorded safety concerns. Firefighting equipment at the tower had not been checked for up to four years; on-site fire extinguishers had expired, and some had the word "condemned" written on them because they were so old. GAG documented its attempts to contact KCTMO management; they also alerted the council's cabinet member for Housing and Property but said they never received a reply.[40][41] In 2013 the council threatened one of the bloggers with legal action, saying that their posts amounted to "defamation and harassment".[42] Two women living in Grenfell Tower, Mariem Elgwahry and Nadia Choucair, were threatened with legal action by KCTMO after they campaigned for improved fire safety.[43] They later died in the fire, at the ages of 27 and 34.[44]

In January 2016, GAG warned that people might be trapped in the building if a fire broke out, pointing out that the building had only one entrance and exit, and corridors that had been allowed to fill with rubbish, such as old mattresses. GAG frequently cited other fires in tower blocks when it warned of the hazards at Grenfell.[45] In November 2016, GAG characterised KCTMO as an "evil, unprincipled, mini-mafia" and accused the council of ignoring health and safety laws. GAG suggested that "only a catastrophic event will expose the ineptitude and incompetence of [KCTMO]", adding, "[We] predict that it won't be long before the words of this blog come back to haunt the KCTMO management and we will do everything in our power to ensure that those in authority know how long and how appallingly our landlord has ignored their responsibility to ensure the health and safety of their tenants and leaseholders. They can't say that they haven't been warned!"[46] The Grenfell Tower Leaseholders' Association had also raised concerns about exposed gas pipes in the months before the fire.[47] As with the majority of tower blocks in the UK, Grenfell Tower did not have fire sprinklers.[48]

Meanwhile, in June 2016, an independent assessor had highlighted 40 serious issues with fire safety at Grenfell Tower and recommended action to be taken within weeks. In October, the assessor asked the KCTMO why there had been no action taken for more than 20 issues in the June report. In November 2016, the London Fire and Emergency Planning Authority served a fire deficiency notice, listing many fire safety issues at Grenfell Tower that required action from KCTMO by May 2017. Areas of concern identified included fire doors, the smoke venting system and the firefighters' lift controls.[49][50]

Previous cladding fires and responses

edit

One of the earliest fires that involved cladding materials was the 1973 Summerland disaster on the Isle of Man, which caused 50 deaths. Part of the reason why the fire spread rapidly through the leisure centre was the acrylic sheeting on the exterior of the building.[51][52] In the 1991 Knowsley Heights fire, fire spread up the entire height of an 11-storey building due to its exterior cladding, though it did not enter the interior and nobody was injured.[53] In 2009, external composite panels also played a role in the spread of the Lakanal House fire in Southwark.[54] An article in The Guardian three days after the Grenfell Tower fire described it as a "tragedy foretold", highlighting that there had been previous cladding fires such as the 2015 fire at The Marina Torch in Dubai, United Arab Emirates.[55] As a result of the Garnock Court fire in 1999 the Scottish government had ordered the removal of laminate panels and enacted legislation to prevent their installation.

In 2016, a non-fatal fire at a Shepherd's Bush tower block spread to six floors via flammable external cladding. In May 2017, the London Fire Brigade (LFB) warned all 33 London councils to review the use of panels and "take appropriate action to mitigate the fire risk".[56][57][58][59]

Fire

edit

Initial fire (00:50–01:15)

edit
 
Spread and timeline of the fire

The fire started in the early hours of Wednesday 14 June 2017 at around 00:50 BST (UTC+1), when a fridge-freezer caught fire in flat 16, on the fourth floor. The flat's resident, Behailu Kebede, was awoken by a smoke alarm. After discovering smoke coming from the fridge freezer in his kitchen, Kebede alerted his lodgers and neighbours, before making a call to the LFB at 00:54.[60][note 3] The first two fire engines ("pumps"), were mobilised from North Kensington Fire Station at 00:55.14 and arrived at 00:59.28 and 00:59.14 respectively.[62][63][64] The initial incident commander Michael Dowden said that the fire was visible at this point as a "glow" in the window.[65] A further two pumps were also dispatched.[66][67] Any residents of the tower who called the fire service were told to remain in their flat unless it was affected, which is the standard policy for high-rise fires,[60] as each flat should be fireproofed from its neighbours. Also due to this policy, the building had no central fire alarm.

After most of the firefighters entered the building, a bridgehead (internal base of operations) was set up on the second floor, connecting hoses to the dry riser. They first entered flat 16 at 01:07. It was a further seven minutes before they began tackling the kitchen blaze. At approximately 01:08, the fire began to penetrate the window frame.[67] Within a few minutes, the surrounding cladding panels had also caught on fire. Observing this, the incident commander requested another two pumps and an aerial appliance at 01:13, which triggered the dispatch of more senior officers, a fire investigation unit and two command vehicles.[67] Crew manager (CM) Christopher Secrett at the floor 4 bridgehead and watch manager (WM) Michael Dowden outside had conducted a planning conversation around 01:06. Dowden had noticed the fire breaching the window and offered to spray it with a covering water jet but Secrett was fearful that the resulting steam would scald the two firefighters about to enter the flat.[68][69]

Rapid upward spread (01:15–01:30)

edit

By the time the firefighters began extinguishing the kitchen fire, a column of flames was quickly advancing up the side of the building. At 01:15, a firefighter discovered smoke in flat 26 (directly above flat 16), another discovered residents who had fled smoke on the fifth and sixth floors, and outside large quantities of debris began falling from the burning façade.[67] The flames spread up the side at a "terrifying rate".[70] Attempts to fight the fire with an external jet were unsuccessful, as it was mostly burning behind the waterproof rainscreen.[67] By 01:30, a rising column of flames had reached the roof and the fire grew out of control.[71][67] The fire on the eastern exterior spread sideways and brought smoke and flames into multiple flats.[72][70][73][74]

By 01:18, 34 of 293 residents had escaped.[60] The busiest phase of evacuations was between 01:18 and 01:38, when 110 escaped,[60] with many awoken by their smoke alarms when smoke entered their flat. Due to Ramadan, many observing Muslim residents were awake for the pre-dawn meal of suhur, which enabled them to alert neighbours.[75][76]

LFB rapidly escalated its response during this time period. The number of pumps in attendance was raised from six to eight at 01:19, with a specialist fire rescue unit, bulk breathing apparatus carrier and damage control unit being sent too. Pumps were made up to ten at 01:24, then to fifteen at 01:27 along with a second aerial platform. Two minutes later, pumps were made 20 and two more fire rescue units were mobilised, and pumps were made up to 25 at 01:35, also triggering the dispatch of an assistant commissioner.[67] Dany Cotton, the commissioner of the London Fire Brigade, was also called out and began driving to the scene from her home in Kent.[note 4] The Metropolitan Police Service (MPS) were called at 01:24 to manage the gathering crowd outside.[67] Five minutes later, the London Ambulance Service were also called.[67]

Trapped residents and rescue missions (01:30–02:04)

edit

Due to fire doors not closing and sealing properly, smoke began to spread from affected flats into the lobbies.[66] By 01:33, LFB were receiving calls from residents who reported being trapped in their flats.[67] At some point between 01:30 and 01:40, smoke began to enter the stairwell.[60] The Inquiry later estimated that despite this, the stairs were still passable for over half an hour.[78] Evacuation rates slowed, with 20 escaping between 01:38 and 01:58.[60] More than half of those still trapped at 01:58 were killed, while 48 were rescued between 01:58 and 03:58.[60] The fire continued to spread sideways on the exterior, and by 01:42 had reached the north side.[66]

LFB call handlers collected information from trapped residents and this was relayed to the LFB's command unit at the scene. Communicating through radio proved difficult, due to noise, the sheer volume of talk and possibly the concrete building structure. Instead, details of trapped residents were written on slips of paper and ferried by runners from the command unit to the bridgehead on the second floor. At the bridgehead, incoming firefighters were assigned flats to go to and briefed on whom they would need to rescue.[79] They donned breathing apparatus and headed to the flats to search for residents.

The firefighters encountered thick smoke, zero visibility and extreme heat when they climbed above the fourth floor.[63][80] Some residents had moved location to escape the smoke. Three firefighters who went to rescue a 12-year-old girl on the 20th floor were unable to find her; she had moved to a flat on the 23rd floor. Despite being on the phone to an operator, the operator had no means of knowing what the firefighters were doing,[67] and she later died in this location.[81] Another two firefighters were sent to a flat on the 14th floor with a single resident, only to find eight people (four of them eventually escaped).[82]

Major incident declared (02:04–04:00)

edit

As the fire rapidly spread around the building, witnesses on the ground reported seeing trapped residents switching the lights in their flats on and off or waving from windows to attract help, some holding children as well as hearing residents screaming from all sides of the tower. Eyewitnesses reported seeing some people jumping to their deaths, and four victims were later found to have died from "injuries consistent with falling from a height".[83][84] At least one person used knotted blankets to make a rope and escape from the burning building.[85] Frequent explosions that were reported to be from gas lines in the building were heard.[63]

Outside operations were hindered by falling debris, including burning pieces of cladding. Due to this danger, the police moved crowds away from the building as a safety precaution. The MPS Territorial Support Group was present; besides being a specialist unit for public order policing, they provided riot shields to protect firefighters from falling debris.[86]

Shortly after 02:00, a major incident was declared and the number of fire engines was raised from twenty five to forty and the number of fire-rescue units increased to ten, command vehicles to six, aerial platforms to four, and operational support units to two.[66] Over the course of the operation, 250 firefighters attempted to control the blaze,[87] with more than 100 firefighters inside the building at a given time. Assistant commissioner Andrew Roe assumed direct command of firefighting operations for the next 11 hours. Rather than command the operations directly, commissioner Cotton served as a monitoring officer, overseeing Roe and providing moral support to firefighters. She said that LFB had broken their own safety protocols by entering a large building without knowing whether it was in danger of structural collapse.[77] It was not until the following afternoon that structural engineers were able to assess the structure and determine that it was not in danger of collapse.[63]

By 02:20, the level of smoke in the stairwell constituted a threat to life, although some survivors did escape beyond then.[78] At 02:47 the "stay put" policy, advising those residents in areas unaffected by the blaze to remain there, was abandoned in favour of general evacuation.[16] After this point only 36 additional residents were able to escape. Experts on the subsequent inquiry into the disaster later said that the "stay put" policy should have been discarded an hour and twenty minutes sooner.[88]

Final rescues (04:00–08:07)

edit
 
Grenfell Tower in the early morning of 14 June. The burnt cladding is visible on the outside of the building.
 
Grenfell fire seen at 04:51 on 14 June from Putney Hill, London

By sunrise, firefighters were still busy fighting the fire and attempting rescues on the inside. At 04:14, police addressed the large crowd of onlookers and urgently instructed them to contact anyone they knew who was trapped in the building—if they were able to reach them via phone or Twitter—to tell them they must try to self-evacuate and not wait for the fire brigade.[89] By 04:44, all sides of the building had been affected.[66]

Only two further rescues took place, with one resident being rescued at 06:05 and the last being rescued at 08:07.[66] Firefighters rescued all remaining residents up to the 10th floor and all but two up to the 12th floor, but none got higher than the 20th floor during this time; only two people escaped from the highest two floors.[60]

Residual fire (08:07 – 16 June)

edit
 
Grenfell Tower two days after the fire broke out

At a news conference in the afternoon of 14 June, LFB reported firefighters had rescued 65 people from the building and reached all 24 floors.[90] Seventy-four people were confirmed by the NHS to be in six hospitals across London with 20 of them in critical care.[91]

The fire continued to burn on the tower's upper floors. It was not brought under control until 01:14 on 15 June and firefighters were still damping down pockets of fire when the Brigade issued an update on 16 June.[92] The fire brigade also used a drone to inspect the building and search for casualties.[93] The fire was declared extinguished on the evening of 16 June.[94]

Reporting

edit

Reporting of the disaster escalated as follows:

  • By 05:00, police reported that several people were being treated for smoke inhalation.[95]
  • By 06:30, it was reported that 50 people had been taken to five hospitals: Chelsea and Westminster Hospital, King's College Hospital, Royal Free, St Thomas's, and St Mary's Hospital.
  • By 09:30, London Fire Commissioner Dany Cotton reported that there were fatalities resulting from the fire, but she could not specify how many had been killed because of the size and complexity of the building.[95][96] Cotton said: "This is an unprecedented incident. In my 29 years of being a firefighter, I have never ever seen anything of this scale."[97][98]
  • By 12:00 the Metropolitan Police announced there were six people confirmed dead, and more than 70 in hospital, with 20 in critical condition.[95] The first person announced dead was Mohammed al-Haj Ali, a Syrian refugee.[99] A large number of people were reported missing.
  • At around 17:00, the number of confirmed deaths was increased to 12.[100]

False accounts

edit

In the immediate aftermath of the fire, a number of unsubstantiated reports about casualties circulated online, which were to later be debunked, including that the government had covered up details of the fire and babies' miraculous survival stories.[101][102][103][104][105] A later investigation by the BBC's Newsnight programme found no evidence that these survival accounts were credible: neither the Metropolitan Police, London Ambulance Service nor any A&E departments were able to find any record of this happening.[106][107]

Impact

edit

Deaths

edit
 
Floral tribute with candles for the victims of the Grenfell Tower fire outside Notting Hill Methodist Church on 16 June 2017

The fire caused 72 deaths, including one who died in the hospital a day later and another who died in January 2018.[108][109][110] The latter occurred after an official death toll was announced by police in November 2017.[111] The incident ranks as the deadliest structural fire in the United Kingdom since the 1988 Piper Alpha disaster and the worst UK residential fire since the Second World War.[112]

The dead included many children,[113] five of whom were students at the nearby Kensington Aldridge Academy.[114] The youngest of those known killed, Leena Belkadi, was 6 months old. One victim died in hospital on 15 June 2017 due to inhalation of fire fumes.[109] Additionally, one then-pregnant survivor lost her baby through stillbirth as a result of the fire.[115]

Survivors came from 106 of the tower's 129 flats; eighteen people among the occupants of these flats were reported as dead or missing presumed dead, whereas most of those killed were said to have been in the remaining 23 flats between the 11th and 23rd floors.[116] Some people from lower floors may have tried to move up the building, and it is thought a number of people may have ended up in one flat.[117]

Identification of victims

edit

Police examined the remains of Grenfell Tower and used "every imaginable source" of information "from government agencies to fast food companies" to identify casualties. Their analysis of CCTV evidence concluded that 223 people (of 293 present) had escaped.[118] This investigation took five months, with only 12 fatalities being identified on the actual day of the fire.[100] By the following week, police had estimated that 80 people had died.[119] This was the most widely quoted estimate in the media for several months.[120][121] Some victims were identified from 26 calls to 999 made from inside the 23 flats.[1]

On 19 September 2017, Metropolitan Police Commander Stuart Cundy suggested that the number of dead could be lower than 80 because eight people were being investigated for making fraudulent financial claims for non-existent victims.[120][121][122] By 1 June 2018, this had led to five people being convicted of fraud.[123][124] Obstacles to identifying fatalities included the fact there was no formal register of who was in the building,[125][126] and the number of undocumented subtenants, migrants and asylum seekers who were believed to have been living there.[127] Mayor Sadiq Khan called for an amnesty to ensure that people with pertinent information could come forward.[128]

The first Coroner's Inquests opened on 23 August 2017[129] and all other inquests were opened by 23 November 2017.[130]

In the aftermath of the fire, members of the local community, including a residents' group called Grenfell United,[131][132][133] stated that the official figures were far short of existing estimates, with some believing that the death toll was "in hundreds".[134] Ten days after the fire, only 18 deaths had yet been officially recorded, compared to the estimate of 80 and the eventual figure of 72.[135][136]

Psychological health and human factors

edit

Beyond physical injury, the fire was a traumatic event which had a psychological impact on residents, emergency service workers and the public at large.

On 26 July 2017, at the fourth public meeting of the Grenfell Response Team, a local volunteer reported that there had been at least 20 suicide attempts in north Kensington since the fire, one of which had been completed.[137][138][139] The mental health of many survivors was damaged.[140]

LFB Commissioner Dany Cotton defended the heroism of emergency service workers who themselves were affected by trauma.[87] An on-call counsellor was made available. Around 80 firefighters and Met Police officers were reported to be suffering from their experiences.[141] Cotton told LBC Radio that she too was undergoing counselling.[142][143]

An extra four full-time counsellors were employed (reversing previous staff reductions) and 60 volunteer counsellors were brought in. All firefighters who attended Grenfell were given a psychological health check. The BBC reported that LFB used its reserve budget to bring counselling staff back to 2008 levels.[144]

In July 2017, NHS England issued an open letter to GPs giving advice on symptoms for mental health conditions such as post-traumatic stress disorder (PTSD) that those affected by this fire (or recent terrorism) may be experiencing.[145] It is estimated that 67% of people caught up in the fire, lost relatives, or were rescued or evacuated from the tower, need treatment for PTSD. Further, between 26% and 48% of people living nearby who were not evacuated but witnessed the fire have PTSD. It is unclear how far this indicated reaction to the fire and how far previously existing psychiatric conditions were being uncovered.[146]

The Metropolitan Police Service assigned 250 detectives to the fire, placing additional workload and personal stress on a force that was also investigating recent terrorist incidents, including the London Bridge and Finsbury Park attacks.[147]

Psychologists worked at Kensington Aldridge Academy to support students returning to the original site. Measures have been taken to protect student welfare, such as shielding classroom windows overlooking the tower.[114]

Long-term physical health

edit

On 21 September 2018, the coroner, Fiona Wilcox, expressed concern for the long-term physical health of victims and emergency service workers exposed to smoke and dust inhaled during the fire and subsequent cleanup. Those affected could be at increased risk of conditions such as cancer, asbestosis, COPD and asthma. The tower is known to have contained asbestos and other toxins. In her letter to NHS chief executive Simon Stevens, Wilcox notes that firefighters involved in the 11 September attacks suffered significant health problems from smoke inhalation. She asked for a physical health screening programme to be established to help prevent future deaths.[148][149]

Public Health England have been monitoring the quality of the air around the derelict tower. In a March 2019 report, they stated that "the risk to public health from air pollution remains low."[150] While the fire itself released many toxic chemicals, they were quickly dispersed in the wind.[151] There has not been a full assessment of the risk posed by soil contamination.[150] Also in March 2019, an independent study led by Professor Anna Stec reported in the journal Chemosphere that research had uncovered "significant environmental contamination" in the soil and buildings around the local area, including significant concentrations of benzene, benzo(a)pyrene, phosphorus and polycyclic aromatic hydrocarbons.[151][150] Chemicals in the soil are unlikely to seep into the air, but could be uncovered if the soil is disturbed.[150] Stec said her findings showed "the need for further in-depth, independent analysis to quantify any risks to residents".[150]

Costs

edit

Grenfell Tower was insured by Protector Forsikring ASA for £20 million, but the direct costs of the fire are two orders of magnitude higher. In 2023, The Guardian estimated the total cost at almost £1.2 billion, most of it borne by the state.[152] This estimate includes:[152]

  • £469 million paid by the tower's owner, the Royal Borough of Kensington and Chelsea, mainly for re-housing the survivors
  • £291 million allocated by the British government for costs associated with the site and its conversion to a memorial
  • £231 million for the public inquiry and the police investigation, both still ongoing as of the time of the estimate
  • £150 million obtained in compensation through civil court proceedings by survivors and family members of the deceased
  • £47 million allocated by the cladding manufacturer Arconic for settling civil claims, as well as £35 million paid to Arconic's lawyers and advisers
  • £27 million set aside for civil claims by the main building contractor, Rydon
  • £14.5 million spent on legal fees by the London fire brigade

This means that the direct costs of the fire are about 4,000 times higher than the £293,368 saved by the tower's builders by using combustible instead of non-combustible cladding.[152]

Aftermath

edit
 
Charred remains of the tower after the fire

A total of 151 homes were destroyed in the tower and surrounding area.[153] People from surrounding buildings were evacuated due to concerns that the tower might collapse.[63]

The fire also severely affected three low-rise "finger blocks" adjoining Grenfell Tower. Their residents were evacuated due to the fire. The blocks, Barandon Walk, Testerton Walk and Hurstway Walk, also lost access to hot water as they shared a boiler beneath Grenfell Tower that was destroyed in the fire.[154]

Direct causes

edit

Refrigerator

edit

On 23 June, police confirmed that the fire had started in a faulty Hotpoint FF175B fridge-freezer, manufactured by Hotpoint Indesit, in flat 16.[155] Owners of models FF175BP and FF175BG were urged to register their appliance with the manufacturer to receive any updates. Sixty-four thousand of these models were made between March 2006 and July 2009, after which the model was discontinued. It is unknown how many are still in use.[156]

The Department for Business, Energy and Industrial Strategy (BEIS) commissioned a product safety investigation into the Hotpoint FF175B fridge-freezer. Independent experts examined the remains of the appliance recovered from Grenfell and exemplar models of the same type. They concluded that the design met all legal safety requirements, and there was no need to issue a recall of the model. The Consumers' Association complained that the legal requirements were inadequate.[157][158]

Tenants had repeatedly complained about electrical power surges causing appliances to smoke, and such a surge may have set the fridge-freezer on fire. The local authority knew about complaints and had paid tenants compensation for damaged appliances. Nonetheless, the surges continued. Judith Blakeman, a local Labour councillor, said the surges affected many appliances including fridges. In July 2017, Blakeman said the cause of the surges had not been found.[159]

On 27 November 2018, testifying to the Grenfell Tower inquiry, Dr. J. Duncan Glover, an electrical engineer, provided results[160] from his investigation which, building on results from other investigators,[161]: 4  found the fire in flat 16 likely started within the "large" fridge-freezer (Hotpoint FF175B), near its compressor.[162][161]: 71–73 [163] In particular, he identified at least one instance[161]: 82  where wires in the compartment housing the compressor's relays were not crimped tightly enough to an electrical connector to form a connection that could handle the current flow.[162][161]: 72, 78  In his view, this substandard connection created additional electrical resistance in the compressor circuit, leading to overheating that ignited the insulation of wires, causing a short circuit.[162][161]: 102–103 [164] (The wire insulation was PVC, which Glover said is typically rated only to temperatures of about 90 °C (194 °F).[161]: 86 ) The resulting fire then spread beyond the fridge and continued to grow. Contrasting US and UK safety standards, Glover noted during questioning that US regulations require fridges to have a metal backing, such as steel, which would help contain a fire within the unit, whereas in the UK fridges are permitted to have a plastic backing, which may fuel such a fire.[161]: 132–134 [165]

Glover also testified that the post-fire state of the circuit breaker box (a.k.a. consumer unit) in flat 16 was consistent with the fire starting in the fridge-freezer: The circuit breaker for the fridge-freezer's circuit was found to have tripped off, he said, but with the exception of an RCCB device, all other breakers had remained on.[161]: 28–29  (He noted that it was helpful to his investigation that an occupant of flat 16, Behailu Kebede, shut off the flat's main power switch shortly before vacating the building, thus preserving the state the circuit breakers were in shortly after the fire broke out.[161]: 19–20 ) As for the RCCB device, it had been wired to provide ground-fault protection to two circuits, one of which powered the fridge-freezer (both circuits also had standard circuit breakers). However, as Glover explained, the RCCB was designed to protect against a short to ground, not a short to neutral, as occurred in the fridge-freezer. He concluded that the RCCB unit's activation was due instead to a short to ground in the other circuit — a short likely caused by smoke and soot from the fire permeating an AC socket (outlet) elsewhere in the flat. That short circuit, he said, must have occurred after the breaker for the fridge-freezer's circuit had already tripped off.[161]: 94–96 

Exterior cladding and insulation

edit
 
Anatomy of Grenfell Tower cladding.[166] The structure consists of 3 mm (0.12 in) cladding (Reynobond PE), 50 mm (2.0 in) ventilated cavity, 150 mm (5.9 in) insulation (Celotex RS5000) and 250 mm (9.8 in) existing concrete.[167]

The newly renovated façade of the tower is believed to have been built as follows:[168]

  • exterior cladding: aluminium sandwich plates with polyethylene core (3 mm (0.12 in) each)
  • a standard ventilation gap (50 mm (2.0 in)) between the cladding and the insulation behind it
  • an insulation made of PIR (polyisocyanurate) foam plates (150 mm (5.9 in)) mounted on the existing facade
  • the existing prefabricated reinforced-concrete facade
  • new double-glazed windows of unknown type and material, mounted in the same vertical plane as the PIR foam insulation plates[169]

Both the aluminium-polyethylene cladding and the PIR insulation plates failed fire safety tests conducted after the fire, according to the police.[170]

Earlier in 2014, safety experts had cautioned that the planned insulation was only suitable for use with non-combustible cladding. The Guardian saw a certificate from the building inspectors' organisation, Local Authority Building Control (LABC), which stated that the chosen insulation for the refit should only be used on tall buildings with fibre cement panels, which do not burn. Combustible panels with polyethylene were put up on top of insulation known as Celotex RS5000, made from polyisocyanurate, which burns when heated, giving off toxic cyanide fumes. Despite the above, the Royal Borough of Kensington and Chelsea certified the Grenfell tower building work as allegedly conforming to "the relevant provisions". Council building inspectors visited the site 16 times from August 2014 to July 2016. Kooltherm, a phenolic insulation, was also used on Grenfell. Kooltherm was never tested with polyethylene core aluminium panels according to the manufacturer. The manufacturer, Kingspan, "would be very surprised if such a system ... would ever pass the appropriate British Standard 8414 large-scale test". Kooltherm's LABC certificate states phenolic products, "do not meet the limited combustibility requirements" of building regulations.[171]

The combustible materials used on Grenfell Tower were considerably cheaper than non-combustible alternatives would have been. There appear to have been intense cost pressures over the Grenfell refurbishment. In June 2017, it was stated the project team chose cheaper cladding that saved £293,368, after the Kensington and Chelsea Tenant Management Organisation mentioned in an email the need for "good costs for Cllr Feilding-Mellen [the council's former deputy leader]".[171][172]

A building control officer from the Royal Borough of Kensington and Chelsea reportedly passed the cladding on Grenfell Tower on 15 May 2015, though there was a nationwide warning that the combustible insulation used should only be used with cladding that does not burn.[173]

Aluminium-polyethylene cladding

edit
 
Structure of an ACM sandwich panel. In the case of Reynobond PE, the aluminium sheets' thickness is 0.5 mm (0.020 in) and overall panel thickness may be 3 mm (0.12 in), 4 mm (0.16 in), or 6 mm (0.24 in).[174][175]

Fire safety experts have said that the building's new external cladding was a possible cause of the rapid spread of the fire.[176] Experts said the gap between the cladding and the insulation worked like a chimney to spread the fire.[169] The cladding could be seen burning and melting, causing additional speculation that it was not made of fire-resistant material. One resident said: "The whole one side of the building was on fire. The cladding went up like a matchstick."[177]

Concerns about the dangers of external cladding were raised years before, following a fire in 1991 at flats in Knowsley Heights, Merseyside.[178][179] Recent major high-rise fires that have involved flammable cladding are listed below.[178][180][181][182]

Records show that a contractor had been paid £2.6 million to install an "ACM rainscreen over-clad" during the recent refurbishment at Grenfell Tower.[37] ACM stands for "aluminium composite material", also known as a sandwich panel, the combustibility of which depends on the choice of insulation core material.[178]

One of the products used was Arconic's Reynobond, which is available with different types of core material—polyethylene, as reportedly used in Grenfell Tower (Reynobond PE), or a more fire-resistant material (Reynobond FR).[35][183] The Reynobond cladding reportedly cost £24 per square metre (£20 per sq. yd.) for the fire-retardant version, and £22 (£18) for the combustible version.[183]

According to Arconic's website and brochure for the mainland European market at the time of the fire, the Reynobond PE cladding used was suitable only for buildings 10 m (33 ft) or less tall; the fire-retardant Reynobond FR was suitable for buildings up to 30 m (98 ft) tall; and above the latter height, such as the upper parts of Grenfell Tower, the non-combustible A2 version was supposed to be used ("As soon as the building is higher than the firefighters' ladders, it has to be conceived with an incombustible material").[184][185][186] After the fire, Arconic stopped sales of Reynobond PE worldwide for tower blocks.[187]

Similar cladding containing highly flammable insulation material is believed to have been installed on thousands of other high-rise buildings in countries including Britain, France, the UAE and Australia.[180][188] Advice published by the Centre for Window and Cladding Technology is that where such materials are used in buildings over 18m, the fire performance of the cladding system as a whole must be proven by testing.[189]: 5 

In September 2014, a building regulations notice for the re-cladding work was submitted to the authority and marked with a status of "Completed—not approved".[190] The use of a "Building Notice" building control application is used to remove the need to submit detailed plans and proposals to a building control inspector in advance, where the works performed will be approved by the inspector during the course of their construction. Building inspector Geoff Wilkinson remarked that this type of application is "wholly inappropriate for large complex buildings and should only be used on small, simple domestic buildings".[191]

On 18 June, Chancellor of the Exchequer Philip Hammond stated that the cladding used on Grenfell Tower was banned in the United Kingdom.[192] Grenfell Tower was inspected 16 times while the cladding was being put on but none of these inspections noticed that materials effectively banned in tall buildings were being used. Judith Blakeman, local Labour councillor questioned the competence of the inspectors. Blakeman, representing the Grenfell residents, said, "This raises the question of whether the building regulations officers were sufficiently competent and did they know what they were looking at. It also begs a question about what they were actually shown. Was anything concealed from them?"[193]

The Department for Communities and Local Government stated that cladding with a polyethylene core "would be non-compliant with current Building Regulations guidance. This material should not be used as cladding on buildings over 18 metres (59 ft) in height."[194] On 31 July 2017, the department released results of fire safety testing on the cladding panels used at Grenfell Tower, which were carried out by the Building Research Establishment and assigned the polyethylene filling a category three rating, designating a total lack of flame retardant properties.[195]

Fire safety experts said the tests the government is doing on cladding only are insufficient, as the whole unit of cladding and insulation should be tested including fire stops. Fire safety experts maintain further that the testing lacks transparency, as the government has not described what tests are being carried out.[196]

According to US-based Arconic, the polyethylene version of the material is banned in the United States for use in buildings exceeding 40 ft (12 m) in height, because of the risk of spreading fire and smoke.[197] NPR subsequently stated that nearly all jurisdictions in the US (except three states and the District of Columbia) have enacted the International Building Code (IBC) requirement that external wall assemblies (cladding, insulation, and wall) on high-rise buildings with combustible components must pass a rigorous real-world simulation test promulgated by the National Fire Protection Association under the name NFPA 285.[198][199][200]

To perform the test, the entire planned assembly is constructed on a standardised test rig two storeys tall, with a window opening in the middle, and is continuously ignited with gas burners from two different angles for 30 minutes.[201] The assembly must satisfy numerous performance criteria to pass, including a requirement that flames cannot spread more than 10 ft (3.0 m) vertically from the top of the window opening or 5 ft (1.5 m) horizontally.[199][201]

A single NFPA 285 test can cost over US$30,000, and it certifies only a particular assembly (i.e., a particular combination of parts from specific manufacturers as they are currently fabricated), meaning that any change to any part used for any reason requires a new test.[198][202] As of mid-2017 ACM cladding with a polyethylene core had not been able to pass the NFPA 285 test, and thus had been effectively banned on US high-rise buildings for decades.[199][203] The UK does not mandate the use of such realistic simulations[199][203] and allows its own similar full-scale tests to be bypassed as long as "the wall assembly components, when tested individually, pass small-scale combustibility tests."[204]

Polyisocyanurate insulation

edit
 
The top floors of Grenfell Tower after the fire, showing the burned insulation, with portions of the original structure revealed underneath. The cladding had melted.

The refurbishment also used an insulation foam product named Celotex RS5000, installed behind the cladding.[205] Police said this insulation proved "more flammable than the cladding".[206]

According to its datasheet, the polyisocyanurate (PIR) product—charred pieces of which littered the area around Grenfell Tower after the fire—"will burn if exposed to a fire of sufficient heat and intensity".[35][207] PIR insulation foams "will, when ignited, burn rapidly and produce intense heat, dense smoke and gases which are irritating, flammable and/or toxic", among them carbon monoxide and hydrogen cyanide.[208] The fire toxicity of polyisocyanurate foams has been well understood for some time.[209]

At least three survivors were treated for cyanide poisoning.[210] Simultaneous exposure to carbon monoxide and hydrogen cyanide is more lethal than exposure to the gases separately.[211]

Celotex's Rainscreen Compliance Guide, when specifying Celotex RS5000 in buildings above 18 m (59 ft),[212] sets out the conditions under which the product was tested and for which it has been certified as meeting the required fire safety standards. These include the use of (non-combustible) 12 mm (0.47 inches) fibre cement rainscreen panels, ventilated horizontal fire breaks at each floor slab edge and vertical non-ventilated fire breaks. It states that any changes from the tested configuration "will need to be considered by the building designer".

Cavity barriers

edit

It has been asserted[by whom?] that cavity barriers intended to prevent the spread of fire in the gap between the façade and the building (the chimney effect) were of insufficient size and, in some cases, incorrectly installed, facilitating the spread of fire.[213]

Windows

edit

It has been asserted that windows and their surrounds installed as part of the refurbishment were less fire resistant than those they replaced due to the materials used and that the windows were of insufficient size necessitating larger surrounds. This would facilitate the spread of fire between the interior and exterior of the building.[213]

Criticism of the fire response

edit

Criticism of the response to the fire primarily consisted of condemnation of issues with the emergency response and fire safety regulation practices in the UK at the time. Broader political criticism was also directed at British society, including condemnation of the response by governmental bodies and UK politicians, social divisions, deregulation issues, and poor transparency overall.[214]

Fire and structural safety reviews

edit

United Kingdom

edit
 
Hanover House, a residential tower block in Sheffield, with its cladding partially removed after failing fire safety tests following the Grenfell fire

In the days after the fire, UK local authorities undertook reviews of fire safety in their residential tower blocks. Building regulations also came under review in the light of the fire due to concerns with the rules and their enforcement.[215][216]

On 30 August 2017, the Department for Communities and Local Government published the terms of reference for the Independent Review of Building Regulations and Fire Safety. This independent review was led by Dame Judith Hackitt, who is a senior engineer and civil servant with experience as the Chair of the Health and Safety Executive. The review reported to both DCLG head, James Brokenshire (Sajid Javid at the time the report was commissioned) and Home Secretary, Sajid Javid (Amber Rudd at the time the report was commissioned). The two main aims of the review are firstly to develop improved building regulations for the future, with a focus on residential high-rise blocks, and secondly to provide reassurance to residents that their homes are safe.[217][218]

The Department for Communities and Local Government (DCLG) commissioned tests on how various cladding systems fared in a fire. Seven combinations were tested, and six deemed dangerous. It reported in August 2017 that there were 228 buildings in the United Kingdom cladded using these methods. There are no existing buildings in the UK using the one combination deemed safe, but it could be used to reclad all the buildings that are currently using the other combinations. These findings will be used to help revise the Building Regulations.[219]

On 18 December 2017, Hackitt published her initial report. She described the entire building regulatory system as "not fit for purpose" and made interim recommendations for significant change.[215] The final report was published on 17 May 2018, outlining a number of key failings and recommendations.[220][221] The report did not recommend a ban on the use of combustible cladding on high rise buildings and Hackitt did say that she would support the government if it was to attempt to legislate a ban.[222][223] Recommendations will be reconsidered after the conclusion of the public inquiry. The government is consulting on a possible ban on combustible materials. It is unclear if this applies only to cladding or to insulation as well.[224]

In October 2018, the government announced plans to ban flammable cladding on newly built buildings that were over 18 m (59 ft), as well as for those of certain types such as schools, care homes and student housing. The Fire Brigades Union have argued that it should be entirely banned, and that a ban should also apply to existing buildings.[225]

By November 2019, the Government had identified 446 residential and publicly owned buildings in England over 18 m in height with ACM cladding of the kind used on Grenfell Tower that were unlikely to meet Building Regulations and had pledged £600 million towards paying for remediation. However, as investigations arising from the Grenfell disaster proceeded, along with the Barking Riverside fire in June 2019 and the Bolton Cube fire in November 2019, it became clear that far more buildings in the UK either used materials that did not meet safety standards or were otherwise not constructed in accordance with building regulations.[226] By June 2020, around 2,000 high-risk buildings had been identified over 18m tall in England alone; a further 9,600 high-rise buildings thought to have combustible cladding; and 100,000 between 11 and 18 metres whose status was as yet unknown.[227] In 2019, there was a collapse in confidence in the safety of blocks of flats among mortgage lenders and insurers, leading to the freezing of a substantial section of the UK housing market.[226] By February 2021, the government had pledged somewhat over £5 billion towards the remediation of fire safety problems—a figure that still fell far short of the costs involved, many of which were being borne by owners of flats who had bought them in the belief that they had been built legally.[228]

On 22 June 2020, another London tower block, "Ferrier Point"[229] in Canning Town, Newham was evacuated after a flat fire that occurred on the fourth floor of the tower at around 18:20.[230] Around 60 firefighters attended to fight the fire which was under control by 20:15.[231] The tower block had contained the exact same aluminium composite cladding as the one at Grenfell, but this was removed a year before the fire occurred. Residents were noted as saying that the just-in-time removal of the cladding prevented another tragedy on the scale of Grenfell.[232]

International

edit

In Australia, authorities decided to remove similar cladding from all its tower blocks. It was stated that every tower block built in Melbourne in the previous 20 years had the cladding.[233][234] In Malta, the Chamber of Engineers and the Chamber of Architects urged the Maltese Government to update the building regulations with regards to fire safety.[235] On 27 June 2017, an 11-storey tower block in Wuppertal, North Rhine-Westphalia, Germany was evacuated after it was found that the cladding was similar to that installed on Grenfell Tower.[236]

A month after the fire at Grenfell Tower the external cladding of the newly built 433-room Hilton Hotel at Schiphol airport in The Netherlands was partly removed, over concerns of fire safety.[237][238] Allegedly due to financial problems at the supplier, the material used did not meet the approved standards. Additional to the replacement, an external video system was installed specifically to detect fires. Also a university building in Rotterdam was found to have the same cladding and was subsequently closed and refurbished.[239] 'Dozens' of other buildings in The Netherlands allegedly suffer the same defects.[240]

Days after the fire, the Gibraltar Government ordered a review of the cladding found in all the tower blocks in the British Territory. Fortunately, it was found that the cladding used was non-flammable and therefore not of the same type as at Grenfell.

In response to Grenfell Tower and similar high-rise fires in the Middle East involving exterior cladding, the United Arab Emirates updated its Fire and Life Safety Code in 2018 to mandate the use of the NFPA 285 fire safety test.[241]

Investigations

edit
 
Campaign banner for local community group 'Justice4Grenfell'

The local borough pledged to carry out a full investigation into the fire.[242] Prime Minister Theresa May ordered a full public inquiry, saying that people "deserve answers" to why the fire was able to spread as quickly as it did.[243]

In July 2017, the government offered an amnesty to those who had been illegally sub-letting[244] and a one-year immigration amnesty to those who came forward with information, though did not offer a full guarantee against deportation.[245] On 31 August 2017 Immigration Minister Brandon Lewis announced that the deadline to register for the one-year immigration amnesty for displaced undocumented residents of Grenfell Tower was to be extended by three months to 30 November 2017. Sir Martin Moore-Bick (who leads the public inquiry) wrote to the Prime Minister asking her to consider the long-term future for these residents beyond their value as witnesses for the inquiry. These views were echoed by campaign groups BMELawyers4Grenfell and Justice4Grenfell.[246]

On 16 September 2019 it was reported that London Fire Brigade as a body have been interviewed by Metropolitan Police under caution in respect of the Health and Safety at Work etc. Act 1974.[247] In a press statement, LFB Commissioner Dany Cotton said the brigade had been subject to police investigation from just after the fire; hundreds of officers had given voluntary police interviews; and LFB would continue to assist investigators.[248]

Leilani Farha argued that the failings of Grenfell Tower were a breach of residents' human rights, because they were not sufficiently involved in the way the building was developed, notably safety issues, before the fire and are not sufficiently involved in the investigations after the fire.[249]

Criminal

edit

On 15 June 2017, Metropolitan Police Commander Stuart Cundy announced that a criminal investigation had been opened to establish if there was any case for charges to be brought.[250] On 27 July 2017, police issued a public notice to residents saying that they had "reasonable grounds" to suspect that both the Royal Borough of Kensington and Chelsea and the Kensington and Chelsea Tenant Management Organisation "may have committed" corporate manslaughter. Senior representatives of both organisations are likely to face police interviews under caution. More than sixty companies and organisations are associated with Grenfell Tower, and as of July 2017, police were keeping open all options for a range of possible charges.[251][252] These include manslaughter, corporate manslaughter, misconduct in public office and fire safety offences.[253]

In an interview with the London Evening Standard on 7 August 2017, the Director of Public Prosecutions, Alison Saunders, said investigations are at an early stage and nothing is ruled out. Mrs Saunders said it was more important to build strong cases than to rush to court, and that the DPP had yet to see the evidence. Health and safety legislation and other criminal laws will be considered. If proven, the offence of gross negligence manslaughter carries a maximum life sentence, with a guideline minimum of twelve years.[254][255] For such a charge the prosecution must show sufficient evidence to pass a four-stage "Adomako Test" proving a reprehensible breach of duty of care which caused or contributed to the victims' death.[256]

On 7 June 2018, BBC News reported that the Met Police are investigating the London Fire Brigade for using the "Stay Put" policy. Possible criminal offences under the Health and Safety at Work Act are under consideration.[257]

As of 7 June 2019, thirteen interviews had been held under caution with more expected, and 7,100 statements had been taken from witnesses, family members, emergency service personnel and others.[258] In March 2019, the Met Police said that no criminal charges were likely before late 2021.[259]

Police investigations are independent from the Inquiry and cannot use it directly as evidence, although it will be studied carefully. Following publication on 4 September 2024, Met Police said it would take "at least 12–18 months" before cases could be presented.[260] The CPS stated they did not expect any charging decisions before the end of 2026.[261]

Fraudulent claims

edit

On 19 September 2017, Commander Stuart Cundy briefed that eight people were being investigated for allegedly making false claims to financial support in the name of fictitious victims.[120][121] By 1 June 2018, five people had been convicted for fraud offences after stating they were victims of the fire to claim financial support.[124][123]

New arrests were made in London on 7 June 2018 of a further nine people suspected of fraud.[262] Four were charged a day later. Three people were charged with fraud while one additional suspect was initially charged with drug and theft offences but was eventually charged with fraud on 19 July.[263][264] The other five were released under investigation.

By March 2020, twenty one people had been charged with fraud offences relating to the fire, with all of them being found guilty after twenty investigations by the Metropolitan Police and one investigation by the City of London Police Insurance Fraud Enforcement Department. They were given prison sentences totaling almost 90 years in total after fraudulently claiming around £1 million in pre-paid credit cards, hotel accommodation costs and other funds intended for the victims of the fire.

All of those convicted of fraud stated that they lived in the tower block and that their homes had been destroyed, and many said that members of their family had been killed. They spent their money on lavish holidays, expensive cars and gambling, and some even asked for more money after complaining about the food and WiFi in the hotels they were being housed in. Three of those convicted were also found to have been illegal immigrants living in the UK, and one man was caught with quantities of illegal drugs in his hotel room. Another man was also found to have committed a burglary. A woman who pretended to be a Grenfell victim was found to have made more than fifty false claims to insurers and to have also said she was present at the Manchester Arena bombing and the London Bridge attack just weeks earlier.[265]

Forensic search and recovery

edit
 
View of the lift and hoist system installed on the east face of the tower to remove debris from the tower

Detailed investigations into the causes and possible criminal charges of manslaughter or breach of regulations are in progress. Search dogs, fingertip searches, DNA matching, fingerprinting, forensic dentistry and forensic anthropologists have been used. An external lift was fitted to the building to improve access.[1]

The scale of the search and recovery operation was challenging. Human remains were mixed within an estimated 15.5 tonnes (17.1 tons) of debris on every floor.[266] Time and care was taken during Disaster Victim Identification to maintain a judicial standard and avoid mistaken identity, which could have caused further distress to surviving relatives.[1]

Fire brigade

edit

Following the Newsnight report of 7 July 2017, the LFB said issues encountered in its response to the fire would also form part of the police investigation.[71] LFB Commissioner Dany Cotton said in a Channel 4 News interview on 11 July 2017 that she expected reasonable criticism of the LFB response in the investigation and public inquiry.[87] Following criticism by survivors and victims families, Cotton retired early at the end of December 2019.[267] Her replacement from 1 January 2020 is Deputy Commissioner Andrew Roe.[268]

BBC Radio 4 reported on 16 August 2017 that the Fire Brigade was advised by KCTMO during the refurbishment and fire officers had been shown "fire safety features". Council opposition leader Robert Atkinson, structural engineer Paul Follows and building inspector Geoff Wilkinson all expressed shock that the fire had happened given prior consultation with LFB.[269]

London Fire Brigade said it had not given approval for the work, saying its legal powers are limited. It said firefighters regularly visit buildings to gain familiarity with the layout and equipment, but that this was not the same as a detailed inspection.[270]

Public inquiry

edit

One day after the fire broke out, Prime Minister Theresa May announced a public inquiry into the causes of the fire. Two weeks later, Sir Martin Moore-Bick was appointed to lead it. He pledged that the inquiry would be "open, transparent and fair". The inquiry will run alongside the criminal investigations.

On 15 August 2017, Theresa May announced the terms of reference, accepting in full Moore-Bick's proposals. The inquiry plans to examine the cause and spread of the fire, the adequacy and enforcement of building regulations and fire protection measures, the actions of the council and KCTMO prior to the fire, and the responses of the London Fire Brigade, council and national government.[271] Labour Party politicians and some survivors called for the inquiry to include a broader examination of national social housing policy, which was not included in the terms of reference.[272][273][274] The inquiry's public hearings started on 14 September 2017.[275]

The first report (Phase 1) from the inquiry was officially published on 30 October 2019, but had been leaked and publicised during the press embargo.[276] Originally due in spring 2019, the date was pushed back to October. Moore-Bick told survivors the timing disappointed him.[277]

Moore-Bick's report affirmed the exterior cladding was the primary reason the fire spread out of control, and that it did not comply with the building regulations. He praised the "courage and devotion to duty" of the firefighters but argued LFB suffered from "significant systemic failings" and that incident commanders were not trained to deal with a failure of compartmentation of this scale. The report was welcomed by survivors.[61] On 6 December, Dany Cotton announced she would retire earlier than planned.[278]

The inquiry resumed with Phase 2 on 28 January 2020. The final report was published on 4 September 2024.[279][280]

Equality and Human Rights Commission report

edit

The Following Grenfell report (March 2019) observes that children who witnessed the fire, or who have lost a friend or part of their family, did not know where or how to access help because the services are not available.[281]

The EHRC report expressed particular concern around the placing of disabled people, including wheelchair users, on upper storeys of tower blocks without any consideration about how they could escape in a fire or other emergency. The report considered disabled people had faced discriminatory treatment amounting to breaches of the right to life, the right to safe, adequate housing; and the right to freedom from cruel, inhuman and degrading treatment, further noting that degrading treatment continued after the fire with disabled people being housed in inaccessible premises.[282]

Civil lawsuit

edit

On 11 June 2019, survivors and families of the victims of the fire filed a civil action complaint in the Court of Common Pleas of the First Judicial District of Pennsylvania in Philadelphia against Arconic and Celotex (both of which are headquartered in Pennsylvania), seeking an unspecified amount of money damages for various product liability claims.[283][284] The 420-page complaint alleged that the cladding and insulation were defective because they lacked fire retardant and were therefore combustible.[283][284] Whirlpool, the Michigan-based manufacturer of the Hotpoint refrigerator believed to have caused the fire, was also named as a defendant in the suit on the grounds that the refrigerator contained materials liable to catch fire.[283][284]

By August, the defendants had exercised their right to remove the case to the appropriate federal court: the United States District Court for the Eastern District of Pennsylvania.[285] In November 2019, Arconic resisted production of documents (which were already in the possession of its American lawyers at DLA Piper) on the basis that the cladding at issue had been manufactured by a French subsidiary, Arconic Architectural Products SAS, and that French law prohibits the production of commercial information in foreign legal proceedings without authorisation by a French court.[286] Arconic retained French lawyer Noëlle Lenoir as its expert witness on this issue, and she reviewed 43,303 documents to identify which ones could be disclosed to the plaintiffs.[287] According to its US corporate filings, as of November 2019, Arconic had already spent approximately £30 million on lawyers and advisers to respond to all the criminal and civil investigations, inquiries, and litigation arising out of the fire.[288]

On 16 September 2020, the district court filed a lengthy order granting the defendants' motion to dismiss on the grounds of forum non conveniens (meaning the dismissal was without prejudice to filing claims in English courts).[287] The order, signed by Judge Michael Baylson, acknowledged that the parties' submissions showed that the potential compensatory and punitive damages for the plaintiffs' claims would be higher under Pennsylvania law than English law, but ruled that many other factors weighed in favor of dismissal.[287] The order allowed the plaintiffs to use evidence already obtained through US discovery in support of their claims in English courts, and left open the possibility that they could come back if the English courts were to decide that Pennsylvania law applies to their claims and one or more defendants may be liable for punitive damages under Pennsylvania law.[287] On 8 July 2022, the Third Circuit filed an unpublished opinion signed by Judge Thomas L. Ambro which largely affirmed the district court's dismissal order.[289] However, the Third Circuit also expressly reversed the part of the district court's order which had left open a path for the plaintiffs to come back from English courts.[289] On 21 February 2023, the U.S. Supreme Court filed a terse one-line order summarily denying the plaintiffs' petition for certiorari, which meant their case was over (as far as the U.S. courts were concerned).[290][291]

Civil settlement

edit

In April 2023, a group of 22 parties including cladding company Arconic, Whirlpool, RBKC, KCTMO, and three central government departments, reached a settlement with 900 people,[who?] for about £150 million.[292] Represented by a group of fourteen law firms, claims were initially brought in the English High Court and were then later moved to alternative dispute resolution (specifically, mediation before Lord Neuberger).[293][294] Contributions are also to be made to a restorative justice community project. This outcome does not affect the possibility of future criminal charges, which are to be decided by the CPS following publication of the inquiry report, which was released on 4 September 2024.[295]

Demolition and memorial

edit
 
Grenfell Tower covered in scaffolding and protective wrap in May 2018

Grenfell Tower site manager Michael Lockwood told a public meeting on 26 July 2017 that the building would be covered in a protective wrap supported by scaffolding. This is to protect forensic evidence but would later allow the building to be taken down. The community will be consulted on how the space should be used after demolition.[296]

As of November 2024, deconstruction has still not started, more than seven years later. Structural engineers have advised that the tower poses a risk. The government has said the tower should be "carefully taken down".[297] Plans for the site are expected to be published by the Grenfell Tower Memorial Commission, established in 2018.[298] Lockwood and Thelma Stober were elected as co-chairs in 2020.[299]

In July 2024, the Royal Institute of British Architects (RIBA) started selecting a design team to create a memorial. The team is due to be chosen by 18 September 2024.[300]

Similar disasters

edit

The following are similar fires that spread through exterior wall assemblies (cladding, insulation, wall) containing combustible components. Most of them involved high-rise buildings.

United Kingdom and Isle of Man

edit
 
The 2005 Harrow Court fire in Stevenage caused three deaths
  • 1973 Summerland disaster – leisure centre fire in Douglas, Isle of Man, worsened by the ignition of flammable acrylic sheeting covering the building, led to at least 50 deaths.[52][51]
  • 1991 Knowsley Heights fire – a fire in a tower block in Liverpool that had recently been fitted with rain screen cladding spread from the bottom to the top of the building via the 90 mm (3.5 in) air gap behind the cladding.[301][302]
  • 1999 Garnock Court fire – the fire in a tower block in Irvine, North Ayrshire, spread rapidly up combustible cladding,[181] resulting in one death and four injured.[303] The incident led to a parliamentary inquiry into the fire risk of external cladding and a change of the law in Scotland in 2005 requiring any cladding to inhibit the spread of fire.[304]
  • 2005 Harrow Court fire – in a tower block in Stevenage, Hertfordshire, led to three deaths.[305]
  • 2009 Lakanal House fire – in a tower block in Camberwell, South London, caused by a faulty television set, led to six deaths and at least twenty injured; an inquest "found the fire spread unexpectedly fast, both laterally and vertically, trapping people in their homes, with the exterior cladding panels burning through in just four and a half minutes."[306]
  • 2010 Shirley Towers fire – two firefighters died after tower block fire rapidly escalated.[307]
  • 2016 Shepherd's Court fire – in a tower block in Shepherd's Bush, West London, a faulty tumble-dryer caught fire on the seventh floor, 19 August 2016. The fire spread up six floors on the outside of the building, which is owned by Hammersmith and Fulham Council. There were no fatalities but some suffered smoke inhalation.[57][58][59][56]
  • 2019 De Pass Gardens fire – a fire in a six-storey tower block in Barking, East London spread through all six floors.[308]
  • 2019 The Cube fire – a fire in a six-storey student residence in Bolton, re-clad in 2018 with high-pressure laminate. The fire spread "extremely rapidly" through the top three floors of the building.[309][310]
  • 2021 Poplar/New Providence Wharf fire – a fire that affected three floors of a tower block in New Providence Wharf, Poplar, which also used the same type of cladding tiles, with two people being sent to hospital for smoke inhalation[311]
  • 2024 Spectrum Building fire – a fire in a tower block in Dagenham with known "fire safety issues" and non-compliant cladding.[312]

Elsewhere

edit
 
South Korean firefighters in the 2010 Wooshin Golden Suites fire used a helicopter as part of their operations to put out a cladding fire that rose within minutes from the 4th to the 38th floor.[313][314]
  • 1946 fire at the Winecoff Hotel (Atlanta, Georgia), killed 119 out of 304 residents. It started from ignition of a mattress lying in a corridor and was propagated by painted burlap wall coverings, through wooden doors and openable wooden transoms above the doors and up the single staircase. The upper floors were out of reach of fire ladders. The hotel, which had been advertised as "absolutely fireproof," reopened after 5 years with fire alarms and an automated sprinkler system. US fire safety codes became legally enforceable and applicable to older buildings. Materials had to be tested for flammability. Opening transoms were banned. Flashover was recognised as a means of propagation.[citation needed]
  • 1971 fire at the Daeyeonggak Hotel (Seoul, South Korea), killing 164 and injuring 63.[citation needed]
  • 1974 fire at the Joelma Building (São Paulo, Brazil), killing 175-200 people and injuring 300+. Second deadliest skyscraper fire in world history, surpassed only by the World Trade Center disaster during the 11 September attacks.[315]
  • 2007 fire at The Water Club (Atlantic City, New Jersey, US) – a fire that occurred as the building was nearing completion spread rapidly up aluminium composite panel cladding with a polyethylene core, from the 3rd floor to the top of the 41-floor building.[181][301]
  • 2007 Deutsche Bank Building fire (World Trade Center Site, New York, US) - Ignited by a discarded cigarette during the demolition of the building after it was damaged and contaminated in the collapse of the World Trade Center, two FDNY firefighters (Robert Beddia and Joseph Graffagnino) killed by smoke inhalation, 115 firefighting units injured.[citation needed]
  • 2009 Beijing Television Cultural Center fire (China) – believed to have spread via insulating foam panels on the building's facade.[316][317]
  • 2010 Wooshin Golden Suites fire (Marine City, South Korea) – spread within 20 minutes from the 4th floor to the top of the 38-storey building, which featured flammable aluminium composite cladding with a polyethylene core, along with insulation made of glass wool or polystyrene.[181][313][314][301]
  • 2010 Shanghai fire (China) – destroyed a 28-storey high-rise apartment building, killing at least 58 people; flammable polyurethane insulation applied to the outside of the building was reported to have been a possible contributory factor.[318][319]
  • 2012 Al Tayer Tower fire (Sharjah, United Arab Emirates) – the rapid spread of the fire, which started in a first-floor balcony and spread to the top of the 40-storey (34 residential, six parking floors) tower, was attributed to aluminium sandwich panels featuring a thermo-plastic core.[181][320]
  • 2012 Mermoz Tower fire (Roubaix, France) – saw fire spread rapidly up flammable cladding, resulting in one death and six injured.[321][322]
  • 2012 Tamweel Tower fire (Dubai, United Arab Emirates) – spread across dozens of floors via flammable aluminium cladding.[55][323][320]
  • 2014 Lacrosse Tower fire (Melbourne, Australia) – a fire started on an eighth-floor balcony took just 11 minutes to travel up 13 floors to the building's roof, spreading via the same type of aluminium composite cladding as was used in Grenfell Tower.[324][325]
  • 2015 fire at The Marina Torch (Dubai, United Arab Emirates) – fire spreading up the cladding of several dozen storeys from the 50th floor to the top of the building.[55][326] A second fire occurred on 4 August 2017, again spreading rapidly up the exterior of the building.[327]
  • 2015 fire at The Address Downtown Dubai (United Arab Emirates) – cladding fire in a supertall hotel and residential skyscraper.[180]
  • 2016 Ramat Gan high-rise fire (Ramat Gan, Israel) – a small fire in a flat quickly spread to the top of a 13-storey tower block via combustible external insulation panelling.[328]
  • 2016 Neo Soho fire (Jakarta, Indonesia) – the fire occurred while the building was still under construction and spread rapidly up dozens of floors via flammable cladding.[329][330]
  • 2017 Plasco Building disaster (Tehran, Iran), 21 dead, 250+ injured. The fire caused a complete collapse of the building, damaging numerous nearby structures.
  • 2018 Employees Provident Fund building fire (Petaling Jaya, Selangor, Malaysia) – the fire occurred due to sparks from maintenance works on the building ignited the outer cladding of the building. This is the first fire involving cladding in Malaysia. No one was reported hurt. The fund stated that "there has been no compromise to the data integrity or members' savings in any manner".[331][332]
  • 2018 Edifício Wilton Paes de Almeida (São Paulo, Brazil) was devastated by fire and collapsed. Neighbouring buildings also caught fire.[333] The fire caused at least four deaths, with a further 40 people missing as of May 2018.[334]
  • 2019 Neo200 apartment building fire (Melbourne, Victoria, Australia) – a fire ignited on the 22nd floor of the apartment building located at 200 Spencer Street, and rapidly spread to the 29th floor. It was the second fire at the building; the first happened on 31 December 2015.[335] The tower was known to have the same type of cladding as the Grenfell Tower and the fire was found by a council inspection to have affected sprinkler systems and alarm systems. It was also reported that extra smoke alarms were installed just two weeks before the fire and that some residents had put plastic covers over their smoke alarms. Other residents refused to leave, complicating the evacuation process.[336][337][338]
  • 2021 Torre dei Moro fire (Milan, Italy) – a 20-storey block of flats caught fire on 29 August. "Witnesses have said the fire, which started on the 15th floor, quickly surged through the outside cladding of the building. Video of the blaze showed panels melting off the building in liquefied clumps."[339]
  • 2022 Lotus Garden China Telecom Building fire (Changsha, China) – A fire spread across multiple floors of a high-rise building, no fatalities reported.[340]
  • 2023 Hanoi building fire (Vietnam), fire spread from the basement to the top, caused by a burning electric circuit in the motorbike parking area.[citation needed]
  • 2024 Valencia residential complex fire (Spain), a 14-storey luxury residential complex, clad in similar materials, caught fire and burned rapidly. Fanned by strong winds, the blaze "spread in a matter of 10 minutes", trapping a number of residents and leading to the total destruction of the 135-apartment complex. The fire killed 10 people and injured at least 15 others.[341][342]

See also

edit

Notes

edit
  1. ^ This article uses the post-renovation floor numbering scheme, except where noted.
  2. ^ The floors were originally numbered Ground, Mezzanine, Walkway, Walkway + 1, Floor 1, Floor 2, ..., Floor 20.[12] After the 2015–16 renovation, the floors were numbered Ground, Floor 1, Floor 2, ..., Floor 23. The flat numbers followed a pattern in which the last digit indicated a flat's position on the floor, and the preceding digits indicated the original number of the floor. Thus Flat 16 was in the northeast corner of Floor 1, and Flat 26 was directly above it. The 2015–2016 renovation changed the floor numbers but not the flat numbers. Therefore Flat 16 was now on Floor 4, the former Floor 1.[13]
  3. ^ The inquiry ruled in 2019 that the resident was not to blame.[61]
  4. ^ The most senior officers of the London Fire Brigade take it in turns to be on call at night, to respond to a major incident.[77]

References

edit
  1. ^ a b c d "LATEST: Grenfell Tower fire investigation". Mynewsdesk. Archived from the original on 20 June 2018. Retrieved 16 November 2017.
  2. ^ "Cladding crisis could cost more than £50bn, contractor says". Inside Housing. 20 April 2021. Retrieved 3 September 2024.
  3. ^ Evans, Steve (22 June 2017). "Insurance cost of Grenfell Tower fire". Reinsurance News. Retrieved 9 February 2019.
  4. ^ "Inquiry finds "compelling evidence" Grenfell Tower did not comply with building regulations". Dezeen. 1 November 2019. Retrieved 25 August 2024.
  5. ^ "Fire barrier installation on Grenfell 'some of the worst I've seen', says supplier". Housing Today. 9 March 2021. Retrieved 25 August 2024.
  6. ^ Heathcote, Edwin (14 June 2017). "London tower block's refurbishment raises fire safety questions". Financial Times. Archived from the original on 17 June 2017. Retrieved 16 June 2017.
  7. ^ "Planning Statement" (PDF). Royal Borough of Kensington and Chelsea. p. 3. Archived (PDF) from the original on 17 June 2017. Retrieved 16 June 2017.
  8. ^ "Proposed Sections" (PDF). Royal Borough of Kensington and Chelsea. Archived (PDF) from the original on 14 June 2017. Retrieved 16 June 2017.
  9. ^ "Concerns raised about Grenfell Tower 'for years'". BBC News. 14 June 2017. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  10. ^ "Buildings of London – Grenfell tower". Emporis. Archived from the original on 17 June 2017. Retrieved 14 June 2017.{{cite web}}: CS1 maint: unfit URL (link)
  11. ^ a b "Grenfell Tower floorplan shows how 120 flats were packed into highrise". The Telegraph. 14 June 2017. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  12. ^ a b c "Grenfell Tower regeneration Project – Planning Application, Design and Access Statement" (PDF). The Royal Borough of Kensington and Chelsea. October 2012. Archived (PDF) from the original on 17 June 2017. Retrieved 16 June 2017.
  13. ^ "The Grenfell Tower Inquiry with Eddie Mair – 61 Station Manager Walton – BBC Sounds". BBC.
  14. ^ Whitbread, Nigel. "Lancaster West Estate: An Ideal For Living?". Constantine Gras. Archived from the original on 15 June 2017. Retrieved 16 June 2017.
  15. ^ Dixon, Hayley; Swinford, Steven; Knapton, Sarah; Mendick, Robert (14 June 2017). "Grenfell Tower inferno a 'disaster waiting to happen' as concerns are raised for safety of other buildings". The Telegraph. Archived from the original on 15 June 2017. Retrieved 15 June 2017. Many of those that survived only did so by ignoring official advice to stay in their rooms and close their front doors until the fire was over. ... All fire safety regulations are focused on containing a fire within a building, but this cannot happen if it is spreading along the outside.
  16. ^ a b "Grenfell inquiry: Stay-put advice 'good' says firefighter". BBC News. 4 September 2018. Retrieved 28 November 2018.
  17. ^ "Fire alarm at Grenfell Tower was never meant for residents". The Times. 7 July 2017. Retrieved 4 October 2018.
  18. ^ a b Knapton, Sarah; Dixon, Hayley (16 June 2017). "Eight failures that left people of Grenfell Tower at mercy of the inferno". The Telegraph. Archived from the original on 16 June 2017. Retrieved 20 June 2017.
  19. ^ "Grenfell: previous fire in 2010 caused no injuries". Inside Housing. 16 June 2017. Retrieved 20 April 2019.
  20. ^ MacErlean, Neasa (17 March 1996). "Councillors take back seat as tenants go it alone". The Observer. p. 9.
  21. ^ "Kensington and Chelsea Tenant Management Organisation – The Board". Royal Borough of Kensington and Chelsea TMO. Archived from the original on 17 June 2017. Retrieved 14 June 2017.
  22. ^ Turner, Camilla (9 July 2017). "We are just as important as everyone else, say Tower homeowners". Sunday Telegraph.
  23. ^ a b "Grenfell Tower Regeneration Project Engagement Statement" (PDF). Royal Borough of Kensington and Chelsea. Archived (PDF) from the original on 14 June 2017. Retrieved 14 June 2017.
  24. ^ Rovnick, Naomi (29 June 2017). "Grenfell Tower: the cladding, the contractors and the chain of confusion". Financial Times. Retrieved 14 June 2020.
  25. ^ "Grenfell Tower Q&As – remote heat metering". KCTMO / www.kctmo.org.uk. Archived from the original on 14 June 2017. Retrieved 28 June 2017.
  26. ^ "Harley Facades Limited" (PDF). 14 June 2017. Archived from the original (PDF) on 14 June 2017. Retrieved 14 June 2020.
  27. ^ "Grenfell: Cladding firm suggested use of cheaper panels". BBC News. 11 March 2020.
  28. ^ Prynn, Jonathan (15 June 2017). "Revealed: 'Chimney' Grenfell Tower cladding is used on blocks across London". London Evening Standard. Archived from the original on 15 June 2017. Retrieved 16 June 2017.
  29. ^ "Town and Country Planning (Development Management Procedure) Order 2010 – Approval of Details Reserved by Condition(s)" (PDF). Royal Borough of Kensington and Chelsea. 30 September 2014. Archived (PDF) from the original on 16 June 2017. Retrieved 14 June 2017.
  30. ^ Arconic Architectural Products/Arconic Inc. "Reynobond Europe ACM ACP Aluminium Composite Material". arconic.com. Archived from the original on 17 June 2017. Retrieved 15 June 2017. Reynobond aluminium composite panels is an aluminium panel consisting of two coil-coated aluminium sheets that are fusion bonded to both sides of a polyethylene core.
  31. ^ Knapton, Sarah (16 June 2017). "Grenfell Tower refurbishment used cheaper cladding and tenants accused builders of shoddy workmanship". The Telegraph. Archived from the original on 12 January 2022. Retrieved 28 June 2017. Omnis Exteriors said it had been asked to supply cheaper cladding to installer Harley Facades which did not meet strict fire-retardant specifications. The safer sheets were just £2 per square metre more expensive meaning that for an extra £5,000 the building could have been encased in a material which may have resisted the fire for longer. The cut-price version is banned from use in the US and Germany for tall buildings.
  32. ^ a b Hills, Joe (15 June 2017). "Grenfell Tower: Original proposed contractor was dropped to reduce cost of refurbishment project". ITV News. Archived from the original on 16 June 2017. Retrieved 16 June 2017.
  33. ^ Waite, Richard (14 June 2017). "Grenfell Tower: residents had predicted massive fire". The Architects Journal. Archived from the original on 14 June 2017. Retrieved 15 June 2017.
  34. ^ "Rydon Maintenance Press Statement – Grenfell Tower". Rydon Maintenance. Rydon maintenance limited. Archived from the original on 24 June 2017.
  35. ^ a b c Davies, Rob (16 June 2017). "Complex chain of companies that worked on Grenfell Tower raises oversight concerns". The Guardian. Archived from the original on 16 June 2017.
  36. ^ "Rydon lands Grenfell Tower refurbishment". rydon.co.uk. July 2016. Archived from the original on 14 June 2017.{{cite web}}: CS1 maint: unfit URL (link)
  37. ^ a b "Grenfell Tower, Notting Hill". Harley Facades. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  38. ^ "Residents warned of 'catastrophic' Grenfell Tower block fire three years ago – but pleas 'fell on deaf ears'". The Telegraph. Press Association. 14 June 2017. Archived from the original on 15 June 2017. Retrieved 17 June 2017.
  39. ^ Gentleman, Amelia. "Grenfell: report criticised 'inadequate' management 12 years before fire". The Guardian.
  40. ^ Wahlquist, Calla (14 June 2017). "Fire safety concerns raised by Grenfell Tower residents in 2012". The Guardian. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  41. ^ "Another Fire Safety Scandal". Grenfell Action Group. 21 February 2013. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  42. ^ Roberts, Rachel. "Grenfell Tower blogger threatened with legal action by council after writing about safety concerns". The Independent. Retrieved 7 June 2018.
  43. ^ Osborne, Samuel (18 June 2017). "Two women feared dead in Grenfell Tower were 'threatened with legal action' for raising alarm about fire safety". The Independent.
  44. ^ Booth, Robert (21 July 2022). "Grenfell fire inquiry ends with shocking reminder of the human cost". The Guardian. ISSN 0261-3077. Retrieved 21 June 2023.
  45. ^ "Residents warned of fire risk at London tower block gutted by blaze". ABC News. 14 June 2017. Archived from the original on 15 June 2017. Retrieved 16 June 2017.
  46. ^ Grenfell Action Group (20 November 2016). "KCTMO – Playing with fire!". wordpress.com. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  47. ^ Booth, Robert; Gentleman, Amelia; Khalili, Mustafa (27 June 2017). "Grenfell Tower gas pipes left exposed, despite fire safety expert's orders". The Guardian. Retrieved 28 June 2017.
  48. ^ "Reality Check: Why don't all high-rises have sprinklers?". BBC News. 15 June 2017. Retrieved 8 June 2018.
  49. ^ Busby, Mattha (8 August 2018). "Grenfell fire warnings issued months before blaze, documents show". The Guardian.
  50. ^ Clarke, Tom (7 August 2018). "The first documents that show there were official warnings about fire safety at Grenfell Tower months before tragedy". Independent Television News. Retrieved 7 August 2018.
  51. ^ a b "Service to honour Summerland dead". BBC. 4 September 2006. Archived from the original on 4 April 2023. Retrieved 26 June 2017.
  52. ^ a b "'Chilling' similarity to 1973 fire tragedy". IOM Today. 20 June 2017. Retrieved 26 June 2017.
  53. ^ Thorp, Liam (3 July 2017). "Should Knowsley Heights blaze have been a warning from history for Grenfell?". Liverpool Echo. Retrieved 7 July 2017.
  54. ^ Walker, Peter (28 March 2013). "Lakanal House tower block fire: deaths 'could have been prevented'". The Guardian. Retrieved 20 April 2019.
  55. ^ a b c Doward, Jamie (17 June 2017). "The chronicle of a tragedy foretold: Grenfell Tower". The Guardian. Retrieved 26 June 2017.
  56. ^ a b "Faulty tumble dryer 'caused Shepherd's Bush tower block fire'". BBC News. 6 October 2016. Retrieved 22 August 2017.
  57. ^ a b Grossman, David (21 August 2017). "Ministers 'must act on faulty white goods fire risk'". BBC News. Retrieved 21 August 2017.
  58. ^ a b Smithers, Rebecca (21 August 2017). "London fire brigade calls for urgent action on electrical goods safety". The Guardian. Retrieved 21 August 2017.
  59. ^ a b Hosken, Andrew (27 June 2017). "Fire brigade raised fears about cladding with councils". BBC. Retrieved 28 June 2017.
  60. ^ a b c d e f g h "Twenty-seven minutes and Grenfell Tower fire had taken hold: so why weren't residents told to get out?". The Daily Telegraph. 5 June 2018. Archived from the original on 12 January 2022. Retrieved 5 June 2018.
  61. ^ a b Booth, Robert (30 October 2019). "Grenfell Tower fire survivors welcome damning inquiry report". The Guardian. Retrieved 30 October 2019.
  62. ^ Malkin, Bonnie; Siddique, Haroon (14 June 2017). "What we know so far about the London tower block fire". The Guardian. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  63. ^ a b c d e "London fire: Six killed as Grenfell Tower engulfed". BBC News. 14 June 2017. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  64. ^ "Grenfell Tower Inquiry, Phase 1 Report Vol.2 pp.89-90" (PDF). 4 September 2024.
  65. ^ "Witness statements of Michael Dowden – Grenfell Tower Inquiry". Grenfelltowerinquiry.org.uk. Retrieved 4 February 2019.
  66. ^ a b c d e f "Dr Barbara Lane's expert report – Grenfell Tower Inquiry". Grenfelltowerinquiry.org.uk. Retrieved 4 February 2019.
  67. ^ a b c d e f g h i j k "London Fire Brigade Operational Response – Grenfell Tower Inquiry". Grenfelltowerinquiry.org.uk. Retrieved 4 February 2019.
  68. ^ Inquiry, 26 June 2018, pp. 86–90[full citation needed]
  69. ^ Grenfell Tower Inquiry, Phase 1 Report Vol.2 pp.100-101 (PDF) (Report). 4 September 2024.
  70. ^ a b Millward, David (14 June 2017). "'The whole building has gone': Witnesses describe screams and tears at Grenfell Tower fire in London". The Telegraph. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  71. ^ a b Sweeney, John (7 July 2017). "Grenfell firefighters 'hampered by equipment'". BBC News. Retrieved 8 July 2017.
  72. ^ Bulman, May (16 June 2017). "Grenfell Tower graphic: what we know about how the fire spread". The Independent. Independent Print. Retrieved 17 June 2017.
  73. ^ Erlanger, Steven; Castle, Stephen (13 June 2017). "Fire Engulfs Apartment Tower in London". The New York Times. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  74. ^ "Everything we know about the Grenfell Tower blaze: Why did it happen and how many are injured?". The Daily Telegraph. 16 June 2017. Archived from the original on 12 January 2022.
  75. ^ Horton, Helena (14 June 2017). "Grenfell Tower fire: Muslims Awake for Ramadan Among Heroes Who Helped Save Lives". The Telegraph. London. Archived from the original on 17 June 2017. Retrieved 17 June 2017.
  76. ^
  77. ^ a b Doward, Jamie (17 June 2017). "London fire brigade boss: 'It was a massive risk, but it's our job to go in'". The Guardian. Archived from the original on 17 June 2017. Retrieved 18 June 2017.
  78. ^ a b "Grenfell Tower report: Strip danger cladding off all tower blocks". Evening Standard. 30 October 2019. Retrieved 5 February 2020.
  79. ^ "The Grenfell inquiry: tragic revelations of failure, buck-passing ... and bravery". The Guardian. 4 August 2018. Retrieved 25 September 2018.
  80. ^ "Four ministers were warned about tower block fire risks". BBC News. 19 June 2017. Archived from the original on 19 June 2017. Retrieved 20 June 2017.
  81. ^ "Grenfell firefighter describes frantic search for 12-year-old girl who died in blaze". Independent.co.uk. 29 June 2018. Retrieved 25 September 2018.
  82. ^ "Firefighters encountered panicked group of 14th floor of Grenfell Tower". ITV. 6 July 2018. Retrieved 25 September 2018.
  83. ^ "London fire: Who are the victims?". BBC News. 3 July 2017.
  84. ^ "Grenfell Tower fire: Who are the victims?". ITV.com.
  85. ^ Hartley-Parkinson, Richard. "Video shows man making rope out of bed sheets to try and escape". Metro.co.uk. Archived from the original on 17 June 2017. Retrieved 14 June 2017.
  86. ^ Tom Towers (14 June 2017). "Riot police protect firefighters from falling debris Grenfell tower block fire". Metro.co.uk. Archived from the original on 16 June 2017.
  87. ^ a b c Long, Jackie (11 July 2017). "Dany Cotton: only a 'miracle' could have saved Grenfell". Channel 4 News. Retrieved 12 July 2017.
  88. ^ Symonds, Tom (4 June 2018). "Grenfell Tower: Why was 'stay put' advice so disastrous?". BBC. Retrieved 28 November 2018.
  89. ^ "Firefighters battle huge blaze in London". News.com.au. 14 June 2017. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  90. ^ "London fire: Police confirm 12 dead in Grenfell Tower blaze". The Independent. 15 June 2017. Retrieved 25 July 2017.
  91. ^ Diwakar, Vinod (14 June 2017). "Statement on fire at Grenfell Tower". NHS.
  92. ^ Brigade, London Fire. "London Fire Brigade – Latest Incidents". London-fire.gov.uk.
  93. ^ Kutner, Max (16 June 2017). "London firefighters used drone to battle Grenfell tower blaze". Newsweek. Retrieved 23 June 2017.
  94. ^ "Grenfell Tower fire updates: Victims identities, investigation". Business Insider. 16 June 2017. Retrieved 5 July 2018.
  95. ^ a b c Hunt, Elle (13 June 2017). "London fire: fears of people trapped as major blaze engulfs tower block – latest". The Guardian. Archived from the original on 14 June 2017. Retrieved 14 June 2017. Live coverage, frequently updated.
  96. ^ Witte, Griff (14 June 2017). "London high-rise fire leaves multiple people dead, dozens injured and others missing". The Washington Post. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  97. ^ "AP News: London fire latest: Grenfell Tower fatalities confirmed after residents trapped". The Telegraph. 14 June 2017. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  98. ^ Withnall, Adam (14 June 2017). "London Fire: Structural engineer is monitoring Grenfell Tower's stability after devastating blaze". Independent. Archived from the original on 14 June 2017. Retrieved 16 June 2017.
  99. ^ "Kensington and Chelsea: a wealthy but deeply divided borough". The Economist. 23 June 2017. Retrieved 23 June 2017.
  100. ^ a b Murphy, Emma (14 June 2017). "Grenfell Tower fire: At least 12 dead after inferno engulfs London tower block with death toll set to rise". ITV. Retrieved 30 August 2017.
  101. ^ Moore, Matthew. "Corbynista site Skwawkbox published fake news about Grenfell death toll, Ipso rules". The Times. Retrieved 5 June 2018.
  102. ^ Ball, James (16 June 2017). "No, There Isn't a "D-Notice" Banning the Media from Reporting Details of the Grenfell Fire". Buzzfeed.com. Retrieved 5 June 2018.
  103. ^ "Corbyn supporters 'spread fake news' about Grenfell Tower death toll". The Daily Telegraph. 16 June 2017. Archived from the original on 12 January 2022. Retrieved 5 June 2018.
  104. ^ Harrison, Andrew (6 August 2017). "Can you trust the mainstream media?". The Guardian. Retrieved 5 June 2018.
  105. ^ Weaver, Matthew; Hunt, Elle (14 June 2017). "London fire: six people confirmed dead after tower block blaze – latest updates". The Guardian. Archived from the original on 17 June 2017. Retrieved 14 June 2017.
  106. ^ Grossman, David; Newling, Dan (9 October 2017). "Dramatic Grenfell baby story probably never happened". BBC News. Retrieved 3 January 2022.
  107. ^ Wendling, Mike (29 June 2017). "Grenfell 'miracle baby': Why people invent fake victims of attacks and disasters". BBC News. Retrieved 3 January 2022.
  108. ^ "Grenfell Tower fire: Who were the victims?". BBC News. 30 May 2018. Retrieved 29 June 2018.
  109. ^ a b *May Bulman (16 June 2017). "Grenfell Tower fire: Met Police confirm 30 dead and 12 remain critical". The Independent. Retrieved 1 July 2017.
  110. ^ "Grenfell Tower Inquiry: 22 May 2018, p17 of pdf transcript". Grenfell Tower Inquiry. Retrieved 8 June 2018.
  111. ^ "Grenfell Tower final death toll stands at 71". BBC News. 16 November 2017. Retrieved 16 November 2017.
  112. ^ Brokenshire, James (11 June 2018). "Oral statement to Parliament – Grenfell one year on". GOV.UK. Retrieved 25 June 2018.
  113. ^ "Grenfell Tower: candlelit vigil for victims after grief turned to anger at earlier protests". The Daily Telegraph. 17 June 2017. Archived from the original on 12 January 2022. Retrieved 27 June 2017.
  114. ^ a b "Grenfell: Back to the school". BBC. 19 September 2018. Retrieved 19 September 2018.
  115. ^ "Stillborn baby believed to be youngest victim of blaze". News.com.au. 3 July 2017.
  116. ^ Samuel Osborne (28 June 2017). "Grenfell Tower fire: Total death toll from devastating blaze may not be known until the end of the year, say police". The Independent. Retrieved 1 July 2017.
  117. ^ "No final Grenfell Tower death toll this year, police say". BBC News. 28 June 2017. Retrieved 1 July 2017.
  118. ^ "Commander Stuart Cundy updates on Grenfell Tower policing operation". Met Police. 16 November 2017. Archived from the original on 19 November 2017. Retrieved 22 November 2017.
  119. ^ "Grenfell Tower fire: Seventy-nine people feared dead". BBC News. BBC. 19 June 2017. Archived from the original on 19 June 2017. Retrieved 19 June 2017.
  120. ^ a b c "Grenfell death toll 'may be below 80'". BBC News. 19 September 2017. Retrieved 19 September 2017.
  121. ^ a b c Dixon, Hayley (19 September 2017). "Grenfell death toll may fall as 'fraudsters have invented missing loved ones'". The Telegraph. Archived from the original on 12 January 2022. Retrieved 19 September 2017.
  122. ^ Powell, Tom (19 September 2017). "Police probe 'fraud cases and thefts' following Grenfell Tower disaster". Evening Standard. Retrieved 19 September 2017.
  123. ^ a b "Fraudster who claimed father died in Grenfell fire is jailed – BBC News". BBC News. 1 June 2018. Retrieved 13 June 2018.
  124. ^ a b "Grenfell Tower fraudster admits making up family deaths". BBC News. 2 November 2017. Retrieved 2 November 2017.
  125. ^ "UPDATE: Number of victims of Grenfell Tower fire formally identified". MPS. 27 September 2017. Archived from the original on 4 July 2017. Retrieved 28 September 2017.
  126. ^ "Around 255 people escaped Grenfell Tower fire, police say". 10 July 2017.
  127. ^ Bulman, May (20 June 2017). "Grenfell Tower fire: Undocumented migrants could still be missing". The Independent. Archived from the original on 20 June 2017. Retrieved 20 June 2017. Underreporting of illegal subtenants could also mean the death toll is higher than currently assumed, it is feared. ... Members of the community have also raised concerns that large 'swathes' of foreign nationals who lived in the block and may have been undocumented have simply 'disappeared' and are not on any missing lists, raising concerns that they have either fled the site or are among the dead but unaccounted for.
  128. ^ "Sadiq Khan Backs Amnesty On Grenfell Tower Illegal Immigrants". Presenters: Nick Ferrari. LBC. Archived from the original on 22 June 2017. Retrieved 22 June 2017.
  129. ^ Sherwood, Harriet (23 August 2017). "Inquests open into deaths of four Grenfell Tower fire victims". The Guardian. Retrieved 24 November 2017.
  130. ^ "All the victims of the Grenfell Tower fire named so far". The Guardian. 23 November 2017. Retrieved 23 November 2017.
  131. ^ Amelia Gentleman (28 June 2017). "Grenfell residents' groups compile lists of victims and survivors". The Guardian. Retrieved 28 June 2017.
  132. ^ "London fire: What happened at Grenfell Tower?". BBC. 1 July 2017. Retrieved 4 July 2017.
  133. ^ "'Hundreds' died in Grenfell Tower fire, says shadow Home Secretary Diane Abbott". The Independent. 24 June 2017. Retrieved 25 June 2017.
  134. ^ "Video: Locals claim Grenfell Tower fire death toll 'in hundreds'". Belfasttelegraph. Retrieved 22 June 2017.
  135. ^ "Grenfell Tower: Inquiry opens with tribute to stillborn baby". BBC. 21 May 2018. Retrieved 21 May 2018.
  136. ^ "UPDATE: Number of victims of Grenfell Tower fire formally identified is 18". Metropolitan Police Service. Archived from the original on 4 July 2017. Retrieved 27 June 2017.
  137. ^ "London fire: Sense of community shines through". BBC online. 15 June 2017. Retrieved 28 July 2017.
  138. ^ "Kensington And Chelsea Councillor Kim Taylor-Smith Forced To Apologise After Bereaved Father Walks Out Of Grenfell Meeting". Huffington Post. 27 July 2017. Retrieved 28 July 2017.
  139. ^ "'At least 20 suicide attempts' after Grenfell Tower fire, faith leader claims". The Independent. 27 July 2017. Retrieved 28 July 2017.
  140. ^ Razzall, Katie (24 August 2017). "Grenfell Tower: The mental health toll". BBC News. British Broadcasting Corporation. Retrieved 23 December 2020.
  141. ^ Evans, Martin (23 July 2017). "Emergency service workers suffering post-traumatic stress following terror attacks and Grenfell fire". The Telegraph. Archived from the original on 12 January 2022. Retrieved 27 July 2017.
  142. ^ Ferrari, Nick (21 August 2017). "London Fire Chief Says She Has Received Counselling Since Grenfell". LBC Radio. Retrieved 22 August 2017.
  143. ^ Siddique, Haroon (21 August 2017). "London fire chief says she has had counselling for Grenfell Tower trauma". The Guardian. Retrieved 22 August 2017.
  144. ^ Clare, Sean (9 August 2017). "Grenfell Tower: 60 trauma counsellors brought in for firefighters". BBC. Retrieved 10 August 2017.
  145. ^ "NHS issues advice on mental health care for people affected by terror attacks and Grenfell". NHS. 6 July 2017. Retrieved 5 August 2017.
  146. ^ Osborne, Hilary; Hopkins, Nick (24 July 2018). "Most Grenfell Tower survivors show signs of PTSD – council study". The Guardian.
  147. ^ Sawer, Patrick (21 June 2017). "New laws on van hire may be needed to counter terror, says Met Commissioner". The Telegraph. Archived from the original on 21 June 2017. Retrieved 21 June 2017.
  148. ^ "Grenfell Tower: 'Asbestos particles in smoke' could be risk for survivors". BBC. 21 September 2018. Retrieved 21 September 2018.
  149. ^ Cockerell, Jennifer (21 September 2018). "Grenfell Tower: Coroner leading inquest calls on NHS to set up long term screenings for survivors". The Independent. Retrieved 21 September 2018.
  150. ^ a b c d e Hopkins, Nick (28 March 2019). "Grenfell: toxic contamination found in nearby homes and soil". The Guardian. Retrieved 28 March 2019.
  151. ^ a b Sample, Ian (28 March 2019). "From benzene to BaP: the toxins strewn across Grenfell". The Guardian. Retrieved 28 March 2019.
  152. ^ a b c Booth, Robert; Booth (30 July 2023). "Cost of Grenfell Tower disaster soars to nearly £1.2bn". The Guardian. ISSN 0261-3077. Retrieved 30 July 2023.
  153. ^ Booth, Robert; Rawlinson, Kevin (11 October 2017). "Grenfell fire: only 10 households affected have permanent homes". The Guardian. Archived from the original on 12 November 2020. Retrieved 9 August 2021. the 151 homes that were lost in the tower and in neighbouring Grenfell Walk
  154. ^ Siddique, Haroon (2 July 2017). "Residents near Grenfell Tower will not have to pay rent, says council". The Observer. Retrieved 2 July 2017.
  155. ^ "Grenfell Tower: Fire started in Hotpoint refrigerator, say police". BBC News. 23 June 2017. Retrieved 23 June 2017.
  156. ^ Monaghan, Angela (23 June 2017). "Hotpoint tells customers to check fridge-freezers after Grenfell Tower fire". The Guardian. ISSN 0261-3077. Retrieved 23 June 2017.
  157. ^ Clark, Greg (23 June 2017). "Department responds to police identification of Hotpoint fridge freezer involved in Grenfell Tower fire". GOV.UK. Retrieved 25 June 2017.
  158. ^ "Grenfell Tower: Safety clearance for fridge-freezer model". BBC. 15 May 2019. Retrieved 27 May 2018.
  159. ^ Hosken, Andrew (18 July 2017). "Electricity problems at Grenfell Tower 'never resolved'". The World Tonight BBC Radio 4. BBC News. Retrieved 21 May 2024.
  160. ^ "Expert Evidence - Dr Glover". Grenfell Tower Inquiry. 27 November 2018.
  161. ^ a b c d e f g h i j "Grenfell Tower Inquiry: Expert Evidence - Dr Glover" (PDF). 27 November 2018.
  162. ^ a b c "Grenfell Tower inquiry: Expert says fridge-freezer started blaze". BBC. 27 November 2018. Retrieved 28 November 2018.
  163. ^ "Grenfell Tower Inquiry: Expert Evidence - Dr Glover (27 November 2018 Pt 1 of 2) [1h 54m]" (video). YouTube. 27 November 2018.
  164. ^ "Grenfell Tower Inquiry: Expert Evidence - Dr Glover (27 November 2018 Pt 1 of 2) [2h 40m]" (video). YouTube. 27 November 2018.
  165. ^ "Grenfell Tower Inquiry: Expert Evidence - Dr Glover (27 November 2018 Pt 2 of 2) [0h 34m]" (video). YouTube. 27 November 2018.
  166. ^
  167. ^ "Grenfell Tower Regeneration Project" (PDF). Max Fordham. October 2012. Archived (PDF) from the original on 14 June 2017.
  168. ^
  169. ^ a b Griffin, Andrew (14 June 2017). "The fatal mistake made in the Grenfell Tower fire". The Independent. Archived from the original on 14 June 2017. Retrieved 16 June 2017.
  170. ^ Siddique, Haroon, "Grenfell Tower fire: police considering manslaughter charges", The Guardian, 23 June 2017.
  171. ^ a b Booth, Robert (13 July 2017). "Grenfell Tower: insulation was not certified for use with flammable cladding". The Guardian.
  172. ^ Booth, Robert; Grierson, Jamie (30 June 2017). "Grenfell cladding approved by residents was swapped for cheaper version". The Guardian.
  173. ^ Booth, Robert (14 July 2017). "Flammable Grenfell Tower cladding 'passed' by council officer in 2015". The Guardian.
  174. ^ "Reynobond PE Colorweld 500" (PDF). Reynbond. October 2014. Archived from the original (PDF) on 23 June 2017. Retrieved 19 June 2017.
  175. ^ "Reynobond Aluminum Composite Material" (PDF). Archived from the original (PDF) on 17 June 2017. Retrieved 19 June 2017.
  176. ^ Watson, Leon (14 June 2017). "Did faulty fridge cause Grenfell Tower fire? The theories fire chiefs will examine". The Telegraph. Archived from the original on 15 June 2017. Retrieved 16 June 2017.
  177. ^ Waugh, Rob (14 June 2017). "Grenfell Tower had just had an £8.7m refurb – but was new cladding to blame?". Metro.co.uk. Archived from the original on 14 June 2017. Retrieved 14 June 2017.
  178. ^ a b c "Fire Risks From External Cladding Panels – A Perspective From The UK". Probyn Miers. 2016. Archived from the original on 11 November 2016.
  179. ^
  180. ^ a b c Brook, Benedict; Brennan, Rose. "London Fire: Melbourne skyscraper fire, caused by shoddy cladding, may have been a warning for London". News.com.au. News. Archived from the original on 15 June 2017. Retrieved 15 June 2017.
  181. ^ a b c d e Poh, Weng (26 October 2015). "Stop Fire Spreading Up, Up and Away". Sourceable. Archived from the original on 9 March 2017. Retrieved 15 June 2017.
  182. ^ Foley, James M. (1 May 2010). "Modern Building Materials Are Factors in Atlantic City Fires". Fire Engineering. Archived from the original on 28 September 2015. Retrieved 15 June 2017.
  183. ^ a b Henderson, Barney (16 June 2016). "London fire latest: Grenfell Tower anger grows as death toll could soar above 100". The Telegraph. Archived from the original on 16 June 2017.
  184. ^ Bergin, Tom (16 June 2017). "Maker of panels at London Tower cautioned on high-rise fire risk". Reuters. Archived from the original on 17 June 2017. Retrieved 17 June 2017.
  185. ^ "Fire safety in high-rise buildings – Our fire solutions" (PDF). Arconic Europe. 2016. Archived from the original (PDF) on 17 June 2017. Retrieved 17 June 2017.
  186. ^ "Reynobond Europe – A2 fire solution". Arconic Europe. Archived from the original on 17 June 2017. Retrieved 17 June 2017.
  187. ^ "Grenfell Tower: Cladding firm ends global sales for tower blocks", BBC News, 26 June 2017.
  188. ^ "London fire: Grenfell Tower cladding 'linked to other fires'". BBC News. 15 June 2017. Archived from the original on 15 June 2017. Retrieved 15 June 2017.
  189. ^ "Fire performance of facades – Guide to the requirements of UK Building Regulations" (PDF). Centre for Window and Cladding Technology. Archived from the original (PDF) on 18 July 2019. Retrieved 16 June 2017.
  190. ^ "FP/14/03563 – New floor areas, new overcladding & windows, new heating system, reconfigured podium and entrance. – Grenfell Tower, Grenfell Road, LONDON, W11 1TH". Royal Borough of Kensington and Chelsea Building Control. Royal Borough of Kensington and Chelsea. Retrieved 14 June 2017.
  191. ^ Wilkinson, Geoff (14 June 2017). "If regulations were followed, the Grenfell Tower inferno should have been impossible". The Daily Telegraph. Archived from the original on 15 June 2017. Retrieved 15 June 2017.
  192. ^ Rizzo, Alessandro. "Grenfell Tower cladding is banned in UK, Government says". Sky News. Sky UK. Archived from the original on 18 June 2017. Retrieved 18 June 2017.
  193. ^ Booth, Robert (21 June 2017). "Grenfell Tower: 16 council inspections failed to stop use of flammable cladding". The Guardian. Archived from the original on 22 June 2017.
  194. ^ Davies, Rob; Sample, Ian (16 June 2017). "Experts urge ban on use of combustible materials in tower blocks". The Guardian. Archived from the original on 17 June 2017.
  195. ^ Marrs, Colin (31 July 2017). "Grenfell Tower: shocking tests results revealed". Architects' Journal.
  196. ^ "Tower cladding tests after Grenfell fire lack transparency, say experts", The Guardian, 26 June 2017.
  197. ^ Mitchell, Jonathan; Chaplain, Chloe (16 June 2017). "Residents furious over claims fire-resistant cladding would have cost just £5,000". Archived from the original on 16 June 2017. Retrieved 16 June 2017.
  198. ^ a b Brady, Jeff (24 June 2017). "Some U.S. States Relax Restrictions On Cladding Suspected In Grenfell Tower Fire". NPR News. Washington, D.C.: National Public Radio. Retrieved 25 June 2017.
  199. ^ a b c d Thomas-Peter, Hannah (28 June 2017). "Why the Grenfell Tower cladding is not used in the US". Sky News. Sky UK Limited. Retrieved 28 June 2017.
  200. ^ "NFPA 285 – Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components". Quincy, MA: National Fire Protection Association. 2012.
  201. ^ a b White, Nathan; Delichatsios, Michael (2015). Fire Hazards of Exterior Wall Assemblies Containing Combustible Components. New York: Springer. p. 62. ISBN 978-1-4939-2898-9.
  202. ^ Geren, Ronald L. (2016). Applying the Building Code: Step-by-Step Guidance for Design and Building Professionals. Hoboken, NJ: John Wiley & Sons. p. 222. ISBN 978-1-118-92076-3. Retrieved 25 June 2017.
  203. ^ a b Kirkpatrick, David D.; Hakim, Danny; Glanz, James (24 June 2017). "Why Grenfell Tower Burned: Regulators Put Cost Before Safety". The New York Times. New York. p. A1. Retrieved 25 June 2017.
  204. ^ Verzoni, Angelo (September–October 2017). "London Calling". NFPA Journal. National Fire Protection Association.
  205. ^ "Update – Friday 16th June". Celotex. Archived from the original on 19 June 2017. Retrieved 23 June 2017. Our records show a Celotex product (RS5000) was purchased for use in refurbishing the building ... It is important to state that Celotex manufacture rigid board insulation only. We do not manufacture, supply or install cladding. Insulation is one component in a rainscreen system, and is positioned in that system behind the cladding material.
  206. ^ "Grenfell Tower fire: police considering manslaughter charges". The Guardian. 23 June 2017. Retrieved 27 June 2017.
  207. ^ "Health & Safety Datasheet" (PDF). Celotex. Archived (PDF) from the original on 10 September 2016. Retrieved 16 June 2017.
  208. ^ "Fire Hazard of Polyurethane and Other Organic Foam Insulation Aboard Ships and in Construction". US Department of Labor, Occupational Safety and Health Administration. Archived from the original on 28 April 2017. Retrieved 23 June 2017.
  209. ^ McKenna, Sean Thomas; Hull, Terence Richard (2016). "The fire toxicity of polyurethane foams". Fire Science Reviews. 5. doi:10.1186/s40038-016-0012-3.
  210. ^ Boyle, Danny; Knapton, Sarah (22 June 2017). "Grenfell Tower victims 'poisoned by cyanide' after insulation 'released highly toxic gas'". The Telegraph. Archived from the original on 22 June 2017. Retrieved 23 June 2017.
  211. ^ Junod, Thomas L. (1976). "Gaseous Emissions and toxic hazards associated with plastics in fire situations – a literature review" (PDF). Lewis Research Center, Cleveland, Ohio. NASA. Archived (PDF) from the original on 15 May 2017. Retrieved 23 June 2017.
  212. ^ "Rainscreen Compliance Guide" (PDF). Celotex. Archived (PDF) from the original on 9 August 2016. Retrieved 17 June 2017.
  213. ^ a b Cohen, David (16 April 2018). "Leaked Grenfell dossier reveals how disastrous refurbishment turned tower into a 'tinderbox'". The Evening Standard. Retrieved 8 June 2018.
  214. ^ Multiple references:
    • Emergency response and fire safety regulation practices:
    • Social division:
    • Deregulation:
    • Response by bodies and overall transparency:
  215. ^ a b "Grenfell Tower fire: Building safety cuts corners, says review". BBC. 18 December 2017. Retrieved 18 December 2017.
  216. ^ Grenfell Tower: Government to review building regulations BBC
  217. ^ Javid, Sajid (30 August 2017). "Independent Review of Building Regulations and Fire Safety: publication of terms of reference". GOV.UK. Retrieved 30 August 2017.
  218. ^ Javid, Sajid (30 August 2017). "Independent Review of Building Regulations and Fire Safety: terms of reference". GOV.UK. Retrieved 31 August 2017.
  219. ^ "Grenfell fire: 228 buildings at risk across UK". The Guardian. Press Association. 25 August 2017. Retrieved 26 August 2017.
  220. ^ Wright, Robert (17 May 2018). "Cladding ban alone will not stop next Grenfell, says review". Financial Times. Retrieved 17 May 2018.
  221. ^ Booth, Robert (17 May 2018). "Grenfell review condemns 'race to the bottom' in building safety practices". The Guardian. Retrieved 17 May 2018.
  222. ^ "Hackitt says she would support government ban on combustible cladding". Building. Retrieved 17 May 2018.
  223. ^ "Government will consult on cladding ban". BBC News. 17 May 2018. Retrieved 17 May 2018.
  224. ^ Grenfell-style cladding could be banned on tower blocks, government says The Guardian
  225. ^ "Cladding announcement does not go far enough, says firefighters union". fbu.org.uk. FBU. Retrieved 31 December 2022.
  226. ^ a b Local Government Association, 'Supporting residents who have been affected by cladding issues' (22 December 2020).
  227. ^ Peter Apps, 'Fact check: how many people live in buildings with dangerous cladding?', Inside Housing (30 June 2020).
  228. ^ Hodkinson, Stuart (2019). Safe as Houses: Private Greed, Political Negligence and Housing Policy after Grenfell. Manchester: Manchester University Press. ISBN 9781526141866.
  229. ^ Anstiss, David (26 August 2012). "TQ4081: Ferrier Point, Canning Town". Geograph.org (photograph).
  230. ^ Heren, Kit (22 June 2020). "Canning Town fire: Dozens of firefighters rush to tackle blaze in east London tower block". Evening Standard.
  231. ^ "Canning Town fire: Dozens of firefighters rush to tackle blaze in east London tower block".
  232. ^ "Residents who escaped tower fire say cladding removal prevented another Grenfell".
  233. ^ Lagan, Bernard (19 June 2017). "Australia rushes to strip dangerous cladding after Grenfell disaster". The Times.
  234. ^ Knaus, Christopher (16 June 2017). "South Australia to audit Adelaide buildings for flammable cladding". The Guardian. Archived from the original on 18 June 2017. Retrieved 20 June 2017.
  235. ^
  236. ^ "Grenfell Tower fire: German flats cleared amid cladding fears". BBC News Online. Retrieved 27 June 2017.
  237. ^ Rengers, Merijn; Houtekamer, Carola (13 July 2017). "Brandgevaar dwingt Hilton Schiphol tot nieuwe gevel". NRC. Retrieved 8 May 2018.
  238. ^ "FIRE HAZARD MAKES HILTON A'DAM TO RE-CLAD – Tweha -the bonding people-". Tweha.com. Archived from the original on 27 April 2018. Retrieved 8 May 2018.
  239. ^ "Onderzoek bevestigt: gevelplaten bouwdeel C voldoen niet aan huidige normen voor brandveiligheid". 17 January 2018. Retrieved 8 May 2018.
  240. ^ "Door heel Nederland staan gebouwen met brandgevaarlijke gevelpanelen". Trouw.nl. 22 January 2018. Retrieved 8 May 2018.
  241. ^ Rousseau, Oscar (3 March 2019). "Focus on façade R&D as UAE's updated fire code protects buildings". Construction Week Online. ITP Media Group. Archived from the original on 3 March 2019. Retrieved 29 December 2019.
  242. ^ "Council 'threatened blogger with legal action' over Grenfell Tower warnings". Metro. 14 June 2017. Retrieved 8 June 2018.
  243. ^ "London fire: Prime minister orders full public inquiry". BBC News. Archived from the original on 15 June 2017. Retrieved 15 June 2017.
  244. ^ "Grenfell Tower illegal subletting amnesty announced by Sajid Javid". Sky News. 2 July 2017. Retrieved 4 July 2017.
  245. ^ "Grenfell Tower survivors could be deported in 12 months despite government immigration amnesty". The Independent. 5 July 2017. Retrieved 8 July 2017.
  246. ^ Snowdon, Kathryn (31 August 2017). "Grenfell Tower Immigration Amnesty For Residents Slammed As 'Travesty' By BMELawyers4Grenfell". Huffington Post. Retrieved 31 August 2017.
  247. ^ "Grenfell Tower: Fire brigade interviewed by police". BBC. 16 September 2019. Retrieved 16 September 2019.
  248. ^ Cotton, Dany (16 September 2019). "London Fire Brigade police interview". LFB. Retrieved 17 September 2019.
  249. ^ UK may have breached human rights over Grenfell Tower, says UN The Guardian
  250. ^ "Grenfell Tower fire: Police open criminal investigation into blaze that killed 17 as fears grow death toll could reach 100". The Independent. Archived from the original on 15 June 2017. Retrieved 28 June 2017.
  251. ^ "Police say Grenfell manslaughter charges possible". BBC online. 27 July 2017. Retrieved 28 July 2017.
  252. ^ "Met says Grenfell Tower Council may have committed corporate manslaughter". The Guardian. 28 July 2017. Retrieved 28 July 2017.
  253. ^ "Grenfell Tower fire: Police considering manslaughter, corporate manslaughter and misconduct charges, hearing told". Retrieved 14 December 2017.
  254. ^ Bentham, Martin (7 August 2017). "People responsible for Grenfell Tower disaster may face criminal charges, says prosecutor". Standard. Retrieved 7 August 2017.
  255. ^ Grenfell fire: criminal charges with long prison terms not ruled out The Guardian
  256. ^ "Homicide: Murder and Manslaughter". CPS. 7 August 2017. Retrieved 7 August 2017.
  257. ^ "Police probing fire service over Grenfell Tower disaster". BBC. 7 June 2018. Retrieved 7 June 2018.
  258. ^ "Grenfell fire: Police carry out 13 interviews under caution". BBC. 7 June 2019. Retrieved 7 June 2019.
  259. ^ Dibelius, Georgina (6 March 2019). "Investigation into Grenfell fire 'criminal offences' unlikely to pass findings until 2021". Metro. Retrieved 6 March 2019.
  260. ^ "Met responds to publication of Grenfell Tower public inquiry report". Met Police. 4 September 2024. Retrieved 5 September 2024.
  261. ^ Ferguson, Frank. "CPS statement on Grenfell". Crown Prosecution Service. Retrieved 5 September 2024.
  262. ^ "Nine new arrests re Grenfell Tower fraud". Met Police. 7 June 2018. Archived from the original on 11 June 2018. Retrieved 7 June 2018.
  263. ^ "Grenfell Tower investigation: Three charged with fraud and another with drug offences". Mynewsdesk. Archived from the original on 12 June 2018. Retrieved 9 June 2018.
  264. ^ "Man charged with fraud in relation to Grenfell Tower". Mynewsdesk. Archived from the original on 19 July 2018. Retrieved 19 July 2018.
  265. ^ "The fraudsters who took advantage of Grenfell". Sky News. Retrieved 28 February 2019; "Woman jailed for three years over fraudulent Grenfell and terror attack insurance claims". Sky News. Retrieved 28 February 2019; "Grenfell fire fraudster jailed for scam". 18 December 2018. Retrieved 28 February 2019; "Man jailed for fraud in relation to Grenfell Tower". Mynewsdesk. Archived from the original on 28 March 2019. Retrieved 28 March 2019; "Three further people charged with fraud linked to the Grenfell Tower fire". Mynewsdesk. Archived from the original on 1 May 2019. Retrieved 1 May 2019; "Man charged with fraud offence". Mynewsdesk. Archived from the original on 20 June 2019. Retrieved 20 June 2019; "Man jailed for £75,000 Grenfell handouts fraud". 5 September 2019. Retrieved 5 September 2019; "Grenfell Tower: Man who falsely claimed he survived fire jailed for £96k fraud". Sky News. Retrieved 28 November 2019; "Two jailed for Grenfell Tower-related fraud". Mynewsdesk. Archived from the original on 14 March 2020. Retrieved 6 March 2020; "Grenfell Fraudster Who Wrote 'Glenfell' as Address Jailed for Five Years over £32,000 con | The Crown Prosecution Service". CPS.gov.uk. Retrieved 20 March 2020.
  266. ^ "Police start fingertip search of Grenfell Tower rubble in hunt for 'hidden victims'". Evening Standard. 5 July 2017. Retrieved 27 July 2017.
  267. ^ "Dany Cotton: London Fire Brigade chief to quit early". BBC. 6 December 2019. Retrieved 6 December 2019.
  268. ^ Clifton, Katy (10 December 2019). "Sadiq Khan appoints Andy Roe as London's new fire commissioner after Dany Cotton resigns". Evening Standard. Retrieved 10 December 2019.
  269. ^ Hosken, Andrew (16 August 2017). "London Fire Brigade advised on Grenfell refurbishment". BBC. Retrieved 16 August 2017.
  270. ^ "Grenfell Tower: London Fire Brigade denies it signed off on refurbishment work". The Independent. 17 August 2017. Retrieved 17 August 2017.
  271. ^ "Grenfell fire: Terms of reference published". BBC. 15 August 2017. Retrieved 8 June 2018.
  272. ^ "'Complete betrayal': Survivors will have 'no faith' in Grenfell inquiry as terms are not broad enough, MP claims". Evening Standard. 15 August 2017. Retrieved 17 August 2017.
  273. ^ "Grenfell fire inquiry to consider cause and council response". The Guardian. 15 August 2017. Retrieved 17 August 2017.
  274. ^ "Grenfell inquiry could be 'too narrow', Jeremy Corbyn warns". The Guardian. 30 June 2017. Retrieved 3 July 2017.
  275. ^ "Grenfell Tower fire: Inquiry 'can and will provide answers'". BBC. 14 September 2017. Retrieved 14 September 2017.
  276. ^ Grenfell inquiry accused of focusing on junior firefighters The Guardian, 2019
  277. ^ Grenfell survivors fear inquiry judge will side with establishment The Guardian
  278. ^ Booth, Robert (6 December 2019). "London fire chief Dany Cotton resigns after Grenfell criticism". The Guardian. Retrieved 6 December 2019.
  279. ^ "Final Grenfell report to be released in autumn". BBC News. 23 May 2024. Retrieved 23 May 2024.
  280. ^ "Phase 2 Report". Grenfell Tower Inquiry. Retrieved 4 September 2024.
  281. ^ Doward, Jamie (10 March 2019). "Grenfell children 'didn't know where to turn', says damning report". The Observer. Retrieved 10 March 2019.
  282. ^ "Disabled people had rights breached before and after Grenfell fire, says watchdog". 14 March 2019.
  283. ^ a b c Wood, Sam (11 June 2019). "London high-rise inferno that killed 72 people blamed on Pa. companies in Philly lawsuit". The Philadelphia Inquirer. Retrieved 12 June 2019.
  284. ^ a b c Gorman, Steve (11 June 2019). "U.S. companies sued over London's deadly Grenfell Tower fire". Reuters. Retrieved 14 June 2019.
  285. ^ Murrell, David (7 August 2019). "Why a Group of British Plaintiffs From a London Apartment Fire Are Suing in Philly Court". Philadelphia. Metro Corp.
  286. ^ Evans, Judith (19 November 2019). "Grenfell cladding manufacturer declines to release documents". Financial Times. FT Group. Retrieved 23 May 2020.
  287. ^ a b c d Behrens v. Arconic, Inc., 487 F. Supp. 3d 283 (2020).
  288. ^ Booth, Robert (27 November 2019). "Grenfell cladding firm has spent £30m defending its role in disaster". The Guardian. Retrieved 26 May 2020.
  289. ^ a b Behrens v. Arconic, Inc., 2022 U.S. App. LEXIS 18816, 2022 WL 2593520 (Nos. 20-3606, 21-1040 & 21-1041, 3d Cir. 8 July 2022).
  290. ^ Gough, Paul J. (21 February 2023). "Arconic: Supreme Court declined to take up Grenfell-related suits". Pittsburgh Business Times. Retrieved 3 March 2023.
  291. ^ Behrens v. Arconic, Inc., 2023 U.S. LEXIS 740, 2023 WL 2123819 (No. 22-630, 21 February 2023).
  292. ^ "Grenfell Tower fire: Civil settlement claim worth £150m". BBC News. 2 May 2023. Retrieved 2 May 2023.
  293. ^ Booth, Robert (2 August 2022). "Grenfell Tower fire: Lord Neuberger to mediate in litigation process". The Guardian. Retrieved 21 April 2023.
  294. ^ Apps, Peter (11 April 2023). "Settlement reached for 900 claimants in Grenfell civil case". Inside Housing. Retrieved 12 April 2023.
  295. ^ "Deregulation and Dishonesty Led to Deadly Grenfell Fire, Inquiry Finds". New York Times. Archived from the original on 4 September 2024.
  296. ^ "Grenfell Tower to be covered in protective wrapping". BBC News. 27 July 2017. Retrieved 27 July 2017.
  297. ^ Badshah, Nadeem (5 September 2021). "Grenfell Tower set to be demolished over safety concerns". Guardian. Retrieved 5 September 2021.
  298. ^ "Grenfell Tower: Families angry at lack of consultation over demolition". BBC News. 5 September 2021. Retrieved 5 September 2021.
  299. ^ Ministry of Housing, Communities & Local Government; The Rt Hon Robert Jenrick MP (13 February 2020). "Grenfell Tower Memorial Commission begins work" (press release). UK Government. Retrieved 4 December 2022.
  300. ^ Fulcher, Merlin (10 July 2024). "Search begins for Grenfell Tower memorial design team". Architects' Journal. Retrieved 10 July 2024.
  301. ^ a b c Nathan White; Michael Delichatsios (20 July 2015). Fire Hazards of Exterior Wall Assemblies Containing Combustible Components. Springer. pp. 37–40. ISBN 978-1-4939-2898-9.
  302. ^
  303. ^ "Man dies in tower block inferno". Scotland Herald. 12 June 1999. Retrieved 26 June 2017.
  304. ^ * Vevers, Dan (15 June 2017). "London tower fire: Concerns over cladding stretch back years". STV. Archived from the original on 20 June 2018. Retrieved 26 June 2017.
  305. ^ "Errors revealed in fire report". BBC News. 18 May 2006. Retrieved 24 August 2017.
  306. ^ Wainwright, Oliver; Walker, Peter (14 June 2017). "'Disaster waiting to happen': fire expert slams UK tower blocks". The Guardian. ISSN 0261-3077. Retrieved 16 June 2017.
  307. ^ "Shirley Towers: Firefighter deaths lead to wiring safety change". BBC News. 16 January 2016. Retrieved 29 June 2018.
  308. ^ "Barking fire: Blaze breaks out in east London flats". BBC News Online. Retrieved 9 June 2019.
  309. ^ Robert Booth; Mattha Busby (16 November 2019). "Grenfell United raises concerns over cladding after Bolton student fire". The Guardian. Retrieved 16 November 2019.
  310. ^ Hardy, Jack (30 July 2020). "Grenfell-style tragedy averted at tower block after fire brigade stopped stay-put advice, report finds". The Daily Telegraph. Archived from the original on 12 January 2022. Retrieved 1 August 2020.
  311. ^ "Poplar fire: London tower block blaze leaves two men in hospital". BBC News. 7 May 2021. Retrieved 7 May 2021.
  312. ^ Barton, Alex; Ludlow, Mark (26 August 2024). "London tower block with non-compliant cladding goes up in flames". The Telegraph. ISSN 0307-1235. Retrieved 26 August 2024.
  313. ^ a b "Fire guts high-rise building in Busan". The Korea Times. 1 October 2010. Retrieved 26 June 2017.
  314. ^ a b "High-rise apartments defenseless against fire". The Korea Times. 3 October 2010. Archived from the original on 8 October 2010. Retrieved 26 June 2017.
  315. ^ Hall, Chris (8 March 2020). "From the archive: towering inferno in São Paulo, 1974". The Guardian. ISSN 0261-3077. Retrieved 2 July 2023.
  316. ^ Andrew Jacobs, "China TV Network Apologizes for Fire", The New York Times, 10 February 2009
  317. ^ "What Sparked TVCC? Experts and architects weigh in on how one of Beijing's most modern buildings took flame so quickly". caijing.com.cn. 19 February 2009. Archived from the original on 1 December 2017. Retrieved 26 June 2017.
  318. ^ "What made the London highrise fire so horrific? Tower's cladding may have helped spread blaze". Toronto Star. 15 June 2017. Retrieved 26 June 2017.
  319. ^ "Deadly Fire Shows Risks of China's Building Boom". Time. 18 November 2010. Retrieved 26 June 2017.
  320. ^ a b "The Torch blaze reignites concerns over cladding used for Dubai towers". The National. 9 March 2015. Retrieved 26 June 2017.
  321. ^ Eder, Sebastian (14 June 2017). "Feuerwehr-Chef im Gespräch: Warum ein Feuer wie in London in Deutschland unwahrscheinlich ist" [Fire Department Chief in Interview: Why a Fire like the one in London is unlikely in Germany]. Frankfurter Allgemeine Zeitung (in German). Archived from the original on 15 June 2017. Retrieved 16 June 2017.
  322. ^ "London fire: Grenfell Tower 'renovated with deadly cladding'". The Sydney Morning Herald. 14 June 2017. Retrieved 26 June 2017.
  323. ^ "Cladding issue causes further headache for fire-hit Tamweel Tower". Arabian Business. 10 October 2016. Retrieved 26 June 2017.
  324. ^ "Cladding in London high-rise fire also blamed for 2014 Melbourne blaze". The Guardian. 15 June 2017. Retrieved 26 June 2017.
  325. ^ "Elliot Lake's Deadly Design Flaw". Massive Engineering Mistakes. Series 03. Episode 04. Banijay Science. 2021. 23:25 minutes in. Transcript in comments; personnel in end credits. Retrieved 20 May 2024 – via YouTube.
  326. ^ "Hundreds evacuated after fire engulfs Dubai tower". Al Jazeera. 21 February 2015. Retrieved 26 June 2017.
  327. ^ "Large fire rips through Dubai's Torch Tower". BBC News Online. Retrieved 4 August 2017.
  328. ^ "Hundreds of Israeli buildings 'as vulnerable' as London's Grenfell Tower". The Times of Israel. 26 June 2017. Retrieved 28 June 2017.
  329. ^ "A Perspective On High Rise Building Fires Involving The Façade". Asia Pacific Fire & MDM Publishing Ltd. 10 April 2017. Retrieved 28 June 2017.
  330. ^ "Massive fire crawls up multiple floors in uninhabited Neo Soho apartment building, one worker injured – Coconuts Jakarta". 10 November 2016. Retrieved 28 June 2017.
  331. ^ Zolkepli, Farik (13 February 2018). "EPF building catches fire – Nation". The Star Online. Retrieved 19 June 2019.
  332. ^ hermesauto (13 February 2018). "Fire in Malaysia's EPF building caused by flammable cladding: Official". The Straits Times. Retrieved 19 June 2019.
  333. ^ Hartley-Parkinson, Richard. "Block of flats collapses in Sao Paulo, Brazil, after fire rips through building". Metro. Retrieved 1 May 2018.
  334. ^ "Sao Paulo fire: search for victims' bodies discontinued". Xinhua News. 14 May 2018. Archived from the original on 14 May 2018.
  335. ^ Hall, Bianca; Dow, Aisha; Schetzer, Alana (31 December 2015). "Spencer Street apartment fire: CBD building known to have illegal rooming houses". The Age. Retrieved 4 February 2019.
  336. ^ "Apartment covered in combustible cladding ablaze in Melbourne". The Australian. Retrieved 4 February 2019.
  337. ^ Fox Koob, Simone; Grace, Robyn; Mannix, Liam (4 February 2019). "'Same as Grenfell Tower': Cladding fears as fire rips through Melbourne CBD apartment building". The Age. Retrieved 28 March 2019.
  338. ^ Fox Koob, Simone; Grace, Robyn (4 February 2019). "Extra fire alarms put in a fortnight before blaze ripped through tower". The Age. Retrieved 4 February 2019.
  339. ^ Balmer, Crispian; Graff, Peter (30 August 2021). "Milan mayor says cladding melted in tower block blaze, as in London's Grenfell". Reuters. Retrieved 1 September 2021.
  340. ^ "Fire engulfs 42-storey skyscraper in central Chinese city of Changsha". South China Morning Post. 16 September 2022. Retrieved 2 July 2023.
  341. ^ Seddon, Sean; Vock, Ido (22 February 2024). "Valencia fire: High-rise building engulfed by flames in Spain". BBC News. Retrieved 22 February 2024.
  342. ^ Villena, Tamara (22 February 2024). "El edificio calcinado en Campanar, una promoción de lujo del boom inmobiliario en la Comunitat" [The Scorched Building in Campanar: A Luxury Development from the Real Estate Boom in the (Valencian) Community]. Las Provincias (in Spanish). Retrieved 22 February 2024.

Further reading

edit
edit