The Zhengzhoudong (Zhengzhou East) railway station (simplified Chinese: 郑州东站; traditional Chinese: 鄭州東站; pinyin: zhèngzhōu dōngzhàn) is a railway station for high-speed trains in Zhengzhou, Henan, China. It is located approximately 3 km southeast of the Zhengdong New Area CBD. On the junction of the North-South Beijing–Guangzhou–Shenzhen–Hong Kong high-speed railway and the East-West Xuzhou–Lanzhou high-speed railway, it is one of the largest passenger railway stations in China.
The calligraphic Chinese characters in the station sign were written by Wu Bangguo,[2] the former chairman of the Standing Committee of the National People's Congress.
History
editThe station began construction on 29 June 2009[3] and was opened on 28 September 2012, together with the opening of the Beijing–Guangzhou–Shenzhen–Hong Kong HSR (Zhengzhou-Wuhan section).[4]
On 26 December 2012, the high-speed train services to Beijing was started with the completion of the Beijing-Zhengzhou section of the Beijing–Guangzhou–Shenzhen–Hong Kong HSR.[5][6] It takes about only 2.5 hours from the station to Beijing West by high-speed trains.
On 28 December 2013, Zhengzhou Metro Line 1 commenced operation and started to serve the station.[7]
The intercity train services in Zhengzhou East started on 28 December 2014, with the opening of the Zhengzhou-Kaifeng Intercity Railway.[8] Currently, the intercity trains from the station to Songchenglu (Kaifeng), Jiaozuo and Xinzheng Airport are in operation.
The Zhengzhou-Xuzhou section of the Xuzhou–Lanzhou HSR was opened on 10 September 2016,[9] providing high-speed train services to major cities in eastern China, including Shanghai, Nanjing and Hangzhou
With the opening of the Hong Kong section of the Beijing–Guangzhou–Shenzhen–Hong Kong HSR, a daily high-speed train service (G79/80) connecting this station and Hong Kong West Kowloon became available. It takes about 6 hour and 20 minutes from the station to West Kowloon.[10]
Infrastructure
editThe station covers an area of 219.07 hectares and has a floor area of 350,000 square meters. Costing RMB 4 billion, it consists of 30 platforms (2 side platforms and 14 island platforms) and 32 tracks. Platforms 1-16 are designated for the Beijing–Guangzhou–Shenzhen–Hong Kong high-speed railway and platforms 21-30 designated for the Xuzhou–Lanzhou High-Speed Railway. Platforms 17-20 are for intercity trains.
The station has a total of 7 levels of which 3 are below ground level. The departure hall (waiting area) is on the 3rd level while catering services are provided on the 4th level. Platforms are on the 2nd level. The arrival areas, exits and parking areas are on the ground level. The basement levels are for Zhengzhou Metro.
Self-service flight check-in devices are provided in the intercity waiting area of the departure hall for passengers taking the intercity trains to Zhengzhou Xinzheng International Airport.
Destinations
editCarriers | Destinations |
---|---|
CR Beijing | Baoji South, Beijing West, Changsha South, Chengdu East, Chongqing West, Futian, Guangzhou South, Guiyang North, Kunming South, Lanzhou West, Nanchang West, Nanning East, Qinhuangdao, Shanghai Hongqiao, Shenzhen North, Shijiazhuang, Tangshan, Tianjin West, Wuhan, Xi'an North, Yingtan North, Zhanjiang West, Zhuhai |
CR Chengdu | Beijing West, Chengdu East, Chongqing North, Guiyang North, Xuzhou East |
CR Guangzhou | Beijing West, Changsha South, Guangzhou South, Hong Kong West Kowloon, Jinan West, Shenzhen North, Taiyuan South, Xi'an North, Zhuhai |
CR Harbin | Harbin West, Wuhan |
CR Jinan | Changsha South, Chongqing North, Chongqing West, Guangzhou South, Jinan West, Kunming South, Lanzhou West, Qingdao, Qingdao North, Rongcheng, Shenzhen North, Yantai |
CR Kunming | Beijing West, Kunming South, Yuxi |
CR Lanzhou | Changsha South, Guangzhou South, Hangzhou East, Lanzhou West, Xuzhou |
CR Nanchang | Beijing West, Fuzhou, Lanzhou West, Nanchang West, Xi'an North |
CR Nanning | Beijing West, Jinan West, Nanning East |
CR Shanghai | Chengdu East, Chongqing West, Hangzhou East, Hefei South, Jinhua South, Lanzhou West, Nanjing South, Ningbo, Shanghai, Shanghai Hongqiao, Taiyuan South, Xi'an North |
CR Shenyang | Changchun, Changsha South, Chengdu East, Dalian North, Shenyang North |
CR Taiyuan | Changsha South, Shanghai Hongqiao, Taiyuan South |
CR Wuhan | Beijing West, Guangzhou South, Hankou, Jinan West, Qingdao, Taiyuan South, Tianjin West, Wuhan, Yichang East |
CR Xi'an | Baoji South, Beijing West, Guangzhou South, Guiyang North, Shanghai Hongqiao, Wenzhou South, Xi'an North, Xuzhou East, Yiwu |
CR Zhengzhou | Anyang East, Beijing West, Chengdu East, Chongqing West, Fuzhou, Guangzhou South, Guilin, Guiyang North, Hangzhou East, Hankou, Jiaozuo, Lanzhou West, Luoyang Longmen, Ningbo, Qingdao North, Shenyang North, Shenzhen North, Shanghai Hongqiao, Shangqiu, Songchenglu, Taiyuan South, Wenzhou South, Xi'an North, Xiamen North, Xinzheng Airport, Xuchang East, Zhengzhou |
Gallery
edit-
Aerial view of the station
-
West exit and the business district outside the station
-
Arrival area
-
The Concourse of Zhengzhou East railway station
-
The Concourse of Zhengzhou East railway station
-
Platform of the station
Metro station
editZhengzhou Metro rapid transit station | ||||||||||||||||
General information | ||||||||||||||||
Location | Zhengdong New Area, Zhengzhou China | |||||||||||||||
Operated by | Zhengzhou Metro | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 6 (2 reserved) | |||||||||||||||
Connections | ||||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Other information | ||||||||||||||||
Station code | 138 (Line 1) 513 (Line 5) | |||||||||||||||
History | ||||||||||||||||
Opened | 28 December 2013[11] | |||||||||||||||
Services | ||||||||||||||||
|
Zhengzhou East railway station (Chinese: 郑州东站) is a metro station of Zhengzhou Metro. It is located just beneath the high-speed railway station.
Currently, the station has Line 1 and Line 5 in operation. Reserved platforms for Line 8 had been constructed. In the future, cross-platform interchange between Line 5 and Line 8 will be realized.[12]
Station layout
editThe station has 3 levels underground with 3 island platforms (6 platforms in total). The B1 level is for the station concourse, which houses the customer service center and ticket vending machines. The single island platform for Line 1 is on the B2 level. The dual island platforms for Line 5 and Line 8 are on the B3 level, of which the platforms for Line 8 are not open to public since Line 8 is not operational yet.
See also
editReferences
edit- ^ 客运营业站站点. 12306.cn (in Chinese). Retrieved 11 September 2018.
- ^ 郑武高铁正式开通运行 吴邦国亲笔题写“郑州东站”. hn.cnr.cn (in Chinese). Retrieved 13 April 2018.
- ^ "www.hnta.cn" 亚洲最大火车站郑州东站开工. www.hnta.cn (in Chinese (China)). Retrieved 13 April 2018.
- ^ 郑武高铁、郑州东站今日启用. newpaper.dehe.cn (in Chinese (China)). Retrieved 13 April 2018.
- ^ 京广高铁京郑段具五特点 设计时速350公里 (in Chinese (China)). 25 December 2012. Retrieved 27 September 2018.
- ^ "京广高铁正式开通运营-中国青年报" [Beijing-Guangzhou high-speed railway officially opened]. zqb.cyol.com (in Chinese). 27 December 2012. Retrieved 12 March 2021.
- ^ 郑州地铁1号线正式开通. hn.cnr.cn (in Chinese (China)). Retrieved 13 April 2018.
- ^ 郑州开封城铁开通:省委书记玩自拍 “包拯”捧场. new.qq.com (in Chinese (China)). Retrieved 13 April 2018.
- ^ 郑徐高铁开通运营 网友盛赞河南“朋友圈”越来越大. news.163.com (in Chinese (China)). 13 September 2016. Retrieved 13 April 2018.
- ^ "Long-haul train schedule" (PDF). MTR. Retrieved 26 September 2018.
- ^ 郑州地铁28日中午12点正式迎客 20个站点全开门. henan.qq.com (in Chinese). Retrieved 13 April 2018.
- ^ 郑州东站成“亚洲最大地铁站”. news.dichan.sina.com.cn (in Chinese). Retrieved 14 April 2018.