Skip to content

Update configuration files #2

Update configuration files

Update configuration files #2

Triggered via schedule March 8, 2026 03:48
Status Startup failure
Total duration
Artifacts

This workflow graph cannot be shown

A graph will be generated the next time this workflow is run.

Annotations

1 error
Error
The reusable workflow actions/reusable-workflows/.github/workflows/update-config-files.yml@main is not allowed in SBG-Engineering/setup-node because all reusable workflows must be from a repository owned by your enterprise.